Google快讯 – incinerator

Google
incinerator

实时更新 2020年7月9日
新闻

The incinerator, part of Tyseley Energy Recovery Facility (ERF) and currently operated by Veolia, currently takes 350,000 tonnes of Birmingham's …

Facebook Twitter 标记为不相关

Touching on its single chamber incinerator, he said the facility had done well by moving away from open burning of hazardous waste and was looking …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈