incinerator plant specification

1) Power Supply:
( a) Keys Supply:
( i) Solitary Phase supply; 220– 240V, 50Hz
( ii) Three Stage supply; 380– 415V, 50Hz
( iii) The power supply electrical outlet (sockets) for single phase supply system in the hospital is three pins and also complies with BS1363.

(b) Change:
( i) Mains change is an usual issue, the efficiency needs to be influenced by this problem a tolerance of ± 15% or more in both the nominal voltage ought to be permitted.
( ii) Keys Cut-off (black out) is a typical issue. Where necessary, Uninterrupted Power Supply (UPS) System must be included to avoid damages of equipment as an outcome of abrupt disturbance in power supply.
( iii) There are spikes not necessarily from the keys supply however results when certain plants or devices started.
( iv) Vendors must consequently verify to make sure that their power supply systems will not be affected by the above conditions.

2) Supply Of Water
a) Top quality: the mains supply is tough water. The vendor needs to check/modify their equipment with filters or descalers where required.
b) Stress: this varies and associated with frequent cut off. Where required, the provider ought to include boosters or pumps to conquer this issue.
c) Where required, distributors should consist of water distillers

2-83 Area VI. Demands

3) Temperature level: ambient temperature arrays in between 21– 450 C or even more in poorly ventilated areas. The hottest month of the year is March. Environmental temperature level can be such that inferior rubber and also plastic products can conveniently melt or warped. Prospective buyers must make certain all products will have the ability to endure such temperatures

4) Humidity: moisture is normally high concerning 65– 90%. Electronic devices must be secured to prevent the effect of condensation.

5) Dirt: this is a major issue specifically throughout the dry period. Dust enter equipment and clogs up filters. Extra security needs to be supplied where essential as well as where suitable extra filters provided to last not much less than 5 years constant use.

6) Vermin: these are also offered as well as sometimes participate in equipment to chew cable televisions as well as pee on boards to create short circuit. This can be stopped by offering vermin guard where needed to avoid entrance of such devastating animals.
7) The proposed tools has to adapt the present appropriate international criterion such as ISO; CE; IEC, ANSI and/or BS

8) Language:
a) All tags as well as markings on the tools need to be in English language. b) All software application programs in the suggested devices should remain in English
language
c) All manuals have to be in English language.

9) Each of the devices supplied need to be provided with customer and also technical handbooks. Guidelines on their usage, storage space and also solution must be clearly indicated in the manuals and also where necessary, on the devices.

10) Where appropriate the following will apply:
a) Electrical Safety
i) The device needs to be given with a line (power) cord of acceptable toughness, quality, length, and ampacity and also needs to be protected with appropriate stress reliefs.
ii) The device should include, or the bidder or distributor must offer, power plugs that are sufficient for the maximum voltage and also current of the unit.
iii) The framework needs to be based and grounding resistance needs to not go beyond 0.15 ohm.
iv) If the system is dual protected, it ought to be so labeled.
v) Electrical leakage current from the framework of the device must not exceed
500µA per IEC 601-1 b) Effects of Fluids

Area VI. Needs 2-84

i) Individual and also operator safety and security as well as system performance need to not be detrimentally impacted by fluid spills.
ii) If the unit is impacted, it needs to fall short safely.

c) Overcurrent Security
i) Loss of power to various other devices on the exact same branch circuit due to internal equipment mistakes need to be prevented by using integrates or breaker that are plainly labeled as well as easy to replace or reset.
ii) If merges are made use of, a spare fuse must be provided in an identified holder located alongside the primary fuse holder. Long-term markings near each fuse holder should indicate fuse scores.

d) Line Voltage Variation
i) The device must operate satisfactorily at line voltages from -12.5% to +8%.
of the small line voltage of 220Volts.
ii) The system must not be harmed by voltages from -21% to +12.5% of the small line voltage of 220Volts.

e) Electromagnetic Disturbance (EMI).
i) The device’s performance must not be influenced by EMI emitted or conducted with the high-voltage line from one more tool.
ii) If the system is impacted, it should fail securely.

f) Alarms.
i) The unit needs to have visual or audible alarm systems to advise drivers of any kind of system fault that may trigger harmful or erroneous results.
ii) Audible and/or aesthetic indications ought to trigger when the screen reading gets to and stays at the alarm system restriction.
iii) All alarms must be totally explained in the driver’s handbook.

g) Audible Alarms.
i) Audible alarms need to be distinct as well as easily identified.
ii) Distinct alarm systems must be enabled when the unit is activated (i.e., the default volume need to not be set to OFF) as well as should be clearly audible at any kind of quantity setting.
iii) If the alarm system quantity is flexible, it should not be possible to turn the volume down so reduced that it is not most likely to be heard.
iv) Although an audible-alarm silence is acceptable, the alarm should reoccur automatically if the condition is not remedied.
v) If an alarm is silenced, a visual display ought to plainly indicate which alarm system is handicapped.

h) Visual Alarm systems.
i) Visual alarm systems ought to be simple to recognize.

2-85 Area VI. Requirements

ii) The aesthetic alarm must specify to the trouble and remain on up until the alarm system problem is fixed; it must not be possible to shut off the aesthetic alarm.

i) Building and construction Top quality.
i) The system must have no sharp edges.
ii) All external parts ought to be securely mounted.
iii) The system ought to be protected as well as provide appropriate defense versus relocating and electrically stimulated components.
iv) The system ought to be well constructed with durable products to stand up to common misuse and cleaning.
v) Switches, handles, as well as other controls must be designed for conditions of heavy usage.
vi) Wiring and also tubing ought to be nicely organized as well as packed, if ideal. vii) Mechanical, electrical, as well as pneumatic terminators, connectors, outlets, as well as.
solder joints should be developed to prevent liquid infiltration, inaccurate links, and also mismating of suitable as well as couplings.
viii) Connections must be safe to withstand unintended disconnection and should preserve sterility, when ideal.

j) Controls.
i) The controls (i.e., switches over, knobs, and so on) need to be visible as well as plainly determined, and also their features must be self-evident.
ii) Tool style ought to avoid misconception of display screens and also control setups.
iii) Buttons and also controls ought to be shielded against unexpected setup modifications (e.g., because of a person cleaning versus the panel).
iv) Controls needs to be sealed versus penetration of liquids.

k) Classifying.
i) Labels as well as markings ought to be clear and also readable.
ii) Labels and also markings must be resilient enough to endure regular cleaning and also regular wear.
iii) Proper caution legends ought to be supplied on the unit.

l) Ease of Usage and upkeep.
i) The system must be basic to learn to utilize, operate, and also keep.
ii) The system must have abbreviated operating directions included on or with the unit (e.g., on a laminated card attached to the unit).
iii) The device needs to be simple to clean, sanitize, and/or decontaminate, as ideal. iv) The unit ought to be created for simple accessibility to serviceable components.

m) Special upkeep tools, spare-parts as well as consummables.
i) Where needed or needed, the provider has to consist of any kind of special devices required for the maintenance of the suggested devices.
ii) Each devices should be provided with the suggested spare-parts

Area VI. Demands 2-86

required for precautionary upkeep for 5 years and also where necessary consist of supply of advised spare-parts for rehabilitative maintenance.
n) Training.
i) The supplier is needed to supply adequate training on each devices on the appropriate usage and procedure of the tools.
ii) Similarly, distributors are required to provide adequate supplier’s training on the installation and also maintenance( both preventative and restorative).
o) Packaging and also Storage Space Problems of Tools.
i) The devices and elements should stand up to temperature and also moisture extremes most likely to be experienced throughout storage space and also transportation.
ii) The maker should advise treatments for storage of the equipment.

Medical Waste Incinerators

Incinerator but the dimension of chamber > > 2000 x >> 1200 mm. Plan for burn FLUID Waste +/- 20 liter/hr.
Sustained by Heavy OIL Burner.waste disposal incinerator, with the ability of dealing with both wet and completely dry rubbish. That include house hold wastes as well as dry fallen leaves.
The chamber of the incinerator should have the ability to hold about 200 – – 250 kilogram of waste at an offered time. edical Waste Incinerators.
The mobile unit is our top priority then the taken care of devices. Medical Waste Incinerators. The mobile system is our priority after that the fixed systems.
a; Set Capacity for every design, how much tons can we put in one-time. I require tio under stand in term of batch load one-time I can ut in Kgs.
b: Burning capacity per hr, to recognize just how much time it will certainly take to burn one set and what is cooling down timem each.
c: The amount of set can we place in every day basis per 1 day.
d: The majority of systems will certainly be worked on Gas, so I need to understand the needed pressure of gas in psi to run the system without any issue.
e; I do desire to know a typical life of system and after the amount of years we require the repair service of linning etc.

2. What is your minimum ability and maximum capacity incinerator.

3. You do give secodn hand incinerator in good working condition.
4. We require only double chamber dual heater incinerator.
5. Please send us DEFRA and DADR authorization records by accessory, copy of ISO as well as summary of gas emmission report from burners.

Medical Waste Incinerator PROPOSAL

1. Technical specifications;

I. Dimension of the Incinerator 4,410 W x 3,037 L x 4,836 H mm

II. Ability of the Incinerator Medical waste 50 kg/hr. set feeding (low level calorie worth: 4,000 5,000 kcal/kg)

III. Utility

Utility problem for the incineration devices operating is the adhering to.

1) Fuel: Light oil or Kerosene

2) Electrical Power

Electric Motor

-0.1– 110kW: AC 220V x 3PH x 50Hz

– – Below 0.1 kW: Air Conditioner 220V x 1PH x 50Hz Control Circuit

– – MCC control: A/C 220V x 1PH x 50Hz

– – Instrument: Air Conditioner 220V x 1PH x 50Hz

– – Switch Over Gear: Air Conditioning 220V x 1PH x 50Hz

2. Door -to-door transportation, Setup, Commissioning and Training

3. Prices quotation

– – Cost requires to be given in Ethiopian Birr (incl. VAT)

– – Cost need to include extra cost elements such as products, insurance, installment and training for essential personnel, until approval obligation where suitable

WASTE INCINERATOR

 

–          150 KG/HR

–          Compliant with EU rules, Directive 2000/76/EC

–          Fuel type: Diesel

–          Easy management and maintenance

–          Temperatures:

850 deg C for municipal waste

1000 deg C for medical waste

1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.

the three incinerators for burning as well as incineration of medicines as well as harmful compounds

Demands and specs for the process of supply, installation, operation and ensure the three incinerators for burning and incineration of medications and also harmful compounds for customizeds division

Free 3 years warranty for incinerators from shipment day. In addition of complimentary extra components ensure letter ought to be valid for 10 years from the end date of assurance.
Electric device should be delivered with service guidebook in English
Electric capacity need to be 380-220 v 60 Hz for all devices
Provided time asap
Validity of deal ought to be not much less than 6 months
In situation of order, we need two certifications of origin that must be stamped from Saudi consular office in your nation
Business billing (certified from Chamber of Business).
Two initial costs.
Send out a person to fix as well as educate our staff for 5 people in each area.
Send your manuals for installation systems.
Waiting for your excellent reply.
Please offer details for the complying with,.
1-Technical explanation includes technological specifications, scope of job, the needs of the procedure and also upkeep.
2- Technical explanation for service technicians training and heater drivers.
3- Brochures of stove with all the called for specs

The offer cost must include the following;-.
1. Educating for professionals and also drivers for a period not much less than two days at each website and give trainees training certificates.
Files have to include all the info such as pamphlets, technical sources, operating, maintenance guidebooks, as well as pamphlets dealing with the key-board.
2- Letter from the supplier to give three years warranty for incinerators from delivery day. In addition of free spare parts ensure letter should be valid for one decade from the end day of guarantee.
3- Offer certification that the incinerators are environmentally friendly and also attach proof that environmental management companies in the country of Origin and also your product should be discharges cost-free as a result of the level of sensitivity of its global air ports.
4-copmany should committed shipment, procedure, and also setup within 60 days from the date of site jobs detection.
5- Train 5 individuals for two days for each and every device for a duration of two days for installation, operation, and safety. Provide certifications.
GARANTEE.
Supplies operating as well as emergency situation maintenance also provides totally free spare components for 3 from the starting day of the project. The firm needs to make regular upkeep every 3 months as well as raise the upkeep report to the administration of public problem and also Maintenance.
The business must make all the upkeep work also adjustment of the control and defense tools and also filters/ filters detoxify insulation.
Specs of ovens:.
– Mounting a readymade concrete base (Precast) with Elevation 30 cm in the air and also 20 centimeters listed below the surface area of the planet.
– The dimensions of the base are raised by (2 meters) from the side of burners.
– The remainder of the accessories in all the trends even allows the employee directly feeding as well as upkeep job, cleansing and relocate conveniently thinking about the propensities of the base towards the door for water drainage of water.
– The floor finishing should be high-quality epoxy paint.
– Mount anti-rust and warm Umbrella of brick and also steel (pyramid form) of (5) meters elevation above the ground which set up with the edge of the concrete base by thick galvanized columns.
– This umbrella Cover the website heater and also allow bringing the chimney.
– The website is surrounded by an iron fencing (sheet metal) 3 meters elevation from the surface of the planet in order to shield the incinerators from black blizzard.
– The iron fence must have a 5 meters Width entrance.
– Automatic anti-rust as well as heat electrical circuit should be provided.
– The heating systems are very efficient, emissions-free, risk-free, and environmentally friendly as well as have ability of not less than 3,000 kg of materials as well as the price of melting at least 400 kg/ h.
– The approach of feeding the furnace with a side slot or from the leading and also the exhaust of the smoke is entirely stopped.
– a heating system Have to have two spaces, among them is the main space of not much less than the “5” ranges to the process of burning materials and various other secondary area of not much less “2” ovens to shed resulting gas from the first procedure as well as the smokeshaft.
– The primary component of the body of the heating system is stainless steel box, the thickness of not much less than 7 mm with a layer of zinc phosphate layered with aluminium reflector to warm.
– the thickness of the door of 150 mm as well as a hardness of not less than 170 kg/ m 3 to be scorched, automatic detailed remote system.
– Heaters have to be devastating adequate to burn and blaze the material which stated formerly.
– heating systems must have certifications are supported worldwide ventures and government competent for environmental protection In the country of origin or the General Presidency of Meteorology as well as Setting Protection in Saudi Arabia.
– The stove can benefit 24 hr so regarding allow for the burning of materials for a period of not much less than 12 successive hours and the remainder for air conditioning and gives full gas container with a capability of 1000 L to turn on the oven.
– Must have an automatic ignition and diesel is made use of.
– a heating system has the capacity to hold up against severe temperatures as much as “130o c As well as also, it assures constant procedure of which can be used for 1 day with the capacity to get rid of residues throughout the work of the stove, Protecting layer of calcium have to be present in the rooms with Density not much less than 50 mm as well as a wall thickness of 100 mm.
– Isolation of shedding area: the area in between the walls have to be of the “stainless-steel”. Furthermore, shed space has to full of Thermal insulation product.
– Guarantee that the combustion of materials released in the secondary room must be at least two seconds duration as well as the space is lined with high-density ceramic fibbers.
– Incinerators should contain a system for handling (purification) gasses before emission of the smoke.
– Burners have to have the capacity of self-cooling after completion of the daily operating period.
– Incinerators have to have smokeshaft not much less than “4 meters” height from the surface of the oven, additionally, it should be thermally protected and also non-rust able, as well as need to likewise be removable, installment as well as tide default.
– Electrical capacity called for “220/ 380-volt “60 hertz.
– Incinerators have to be fitted with a control board of the digital tricks to monitor all the essential indicators of activation tricks, as well as start-up and switch off so as to be separated inside a steel box with the presence of the following:.
Alarm system Sensor in the event of (accidents “heater” or filtration device or heat leakage or interior connections as well as electrical wiring).
Screens for the temperature level of the rooms.
Aerosols Filter signs/ monitors.
Area temperature level sensors.
Indicators for furnaces as well as index overload.
Timer for Extinguish the stove instantly depending upon the moment called for.
– All devices should be very immune to exterior conditions such as high temperature (50oc).
– All doors have to have unique lock are not allowed non-persons assigned to function.
– Supplying fire extinguisher for each website with an ability of 10 kg at least

an animal incinerator for the cremation of dogs

We have a 70 bed medical facility in namibia. There is a potential of getting customers from various other regional doctors.
a little burners (ex. please see attached) for some empty chemical bags. Can you please supply me with some details info about these sort of incinerators (small range). a pet incinerator for the cremation of pets and pet cats. It will certainly be solitary use of each animal seperately.Initially we are planning to start this Pilot Task with the National Medical facility, to convince the Ministry Officials as well as on its success to take this project to the Teaching Hospitals, Area and Base Hospitals in the Country.municipality requirement 4 crematory machine for bodies. I require some info regarding cost, kine of power for activation, harmful exhaust, The incinerator we are looking must be with the benefits of Warm recycling system, usage of hot water, and so on. Capability– 150-200 kgs/hr and with International standards.get more details about the Family pet Cremation Tools, specifically for canines as well as felines.

incineration Heater for burning patalogical

incineration Heater for burning patalogical (such as human tissue or blood) as west

The weight of this west materials is 700 kg per month and also we require an isolated heating system

Without fume as well as any kind of damaging gas

. INCINERATOR SPECIFICATION

# Summary Specification

1 Burning Capacity – – 400 kg/time and also must not be much less than 300 kg/time. Optimum combustion time need to be 6 times/day

2 Smokeshaft outside diameter – – 300 to 400 mm

3 Fan power – – Need to not exceed 1.1 kw

4 Voltage – – 220V

5 Oil consumption – – Have to not surpass 14kg/h

6 Feeding door diagonal dimension (mm) – – Not less than 500mm 7 Incineration Temp. (⁰ C) – – 800 or above 8 Exhaust

Carbon Monoxide – – Must not go beyond 100 mg/m3

SO2 – – Need to not go beyond 400 mg/m3

HF – – (Hydrogen fluoride) Must not surpass 9.0 mg/m3

NO2 – – Should not exceed 500 mg/m3

Smoke dirt – – Need to not exceed 100 mg/m3

9 Elevation of the Burner – – Not much less than 10m over ground level

10 Maker’s Service warranty – – Not less than 1 year

11 Electrical Connection – – From closest circulation box using 25mm2 electrical cord and also all relevant connections and circuitry

Animal body components , other biomedical waste , body organs dung

51.No    Features    $_pecific tions
1    (Incinerator)
Type of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2.    Load capacity    300 – 4∞Kg (maximum)
3.    Bum capacity    100 Kgjhr (minimum)
4    Fuel    Diesel (LDOjHSD)
5.    Type of Bumer operation    Automatic diesel fired
6.    Primary chamber    Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7.    Secondary chamber    Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8.    Temperature control    Digital temperature control and display
Temperature monitoring and thermostatic control
9.    Power supply    220V for control Box
10    Size    Compact design preferred
11.    Opening lid    Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12.    Fuel tank    100-150 L

13.    Civil    works,    installation    and
comnuss!Onmg    lndusive  of  civil  works  (brick  wall  incinerator  house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite  demonstrationjperformance  test  and  adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate   Annual    Maintenance    Contract   would    be drawn with the supplier at a later stage.
14.    Catalogue    Catalogue containing detail pictures and spec迁ications
of  the  quoted  incinerator  must  be  included  in  the
bidding document

Incinerator capable of dealing with in between 300 & & 500 kgs fitted with the wet scrubber system

Automatic filling and refilling with capability of 10 to 12 bunches per day working with gas therapy techniques and gas fuel and also ought to comply with the European Standards.the Federal Government Healthcare Facility for Medical Waste Incinerator with the adhering to Specifications. they are having basic wastes like cells, plastic bottles etc, wastes originating from work camps, to be incinerated, they require, 50kg/hr incinerator
MEDICAL WASTE INCINERATOR.our healthcare facility produce 40 kg daily from all waste product
–– Capability: 1000 kg/h
–– Kind waste: industrial waste
–– Other demands: Automatic waste filling system and exhaust therapy system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2 humans resources.
4. Gas consumption: 7 litres per set. Incinerator with the ability of treating in between 300 & & 500 kgs fitted with the wet scrubber system.complete Burner with an ability of 500kgs/ hr with a wet scrubber device. a 10-20Kg per hour of residential waste? Likewise, I would like to understand what is the minimum ability burner you have in instance we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capability as I am in ownership of a huge quantity of mixed/municipal waste (4/5 million tonnes) of the following make-up (52% natural, 12% plastic, 16% paper, 6% metal, 4% glass and also 10% other). The EU codes of the waste are as complies with: 20 03 01, 19 12 10 and 19 12 12.
Among the vital making a decision aspects of the prospective distributor is the energy usage of the strategy, showed either per hr or daily and also I would certainly appreciate if such information can be made available.