250kgs per hour capacity waste incinerator

Incinerator Model TS250 PLC, Overview

This model is small-scale waste incineration equipment for small waste output. Construction 

is dual/double combustion chamber with 02 units oil burner, batch load incineration equipment. 
Waste feed chamber is 1800Liters (1.8m3, TS250 PLC). Primary & Secondary combustion chambers
and smoke filter chamber. Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation. 

Main Product List per 01 set

Primary Combustion Chamber

Secondary Combustion Chamber

Smoke Filter Chamber

Incinerator PLC Control Case

Chimney:10.0Meters

*(upgrade to Stainless Steel, free cost)

Italy oil/gas burner: 02 units

Oil Tank (if oil fuel): 300Liters








Items/Model

TS200(PLC)

Picture

 

Principle

Solid Waste Incineration Treatment

Burn Rate

Average 250 kg/hour

Feed Capacity

Average 350kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1800L

Internal Dimensions

150x110x110cm

Secondary Chamber

750L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

0.9Kw

Oil Consumption (kg/hour)

Average 28

Gas Consumption (m3/hour)

Average 33.6

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

300L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

8500kg

External Dimensions

300x160x190cm

Burner operation should be Automatic On/Off

Fuel : diesel

The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” combustion must have:

;

・ Refractory concrete :

§ . Thickness : ≥100 mm

§ . Nature: 42% of Al203

・ Insulate in fibrous panels :

§ . Thickness: ≥75 mm

・ Nature: Calcium silicate.

* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

 

A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of injection of air allowing a total recombustion of gases,

* A device of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases burnt.

* Carcass in strong sheet steel with support of connection.

* Composition of the refractory;

・ Refractory concrete :

§ Thickness : ≥150 mm

§ Nature: 65% of Al203

・ Insulate in fibrous panel :

§ Thickness: ≥85 mm

 Nature: Calcium



For incineration, general and pathological incinerators

Main unit
Application    For incineration, general and pathological
Capacity      50 – 60 kg/h burn rate
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
Operating time                   Minimum 8 hours daily
Operating temperature        From 850 0C to 1200 0C, Automatic controlled
Residual Ash                       5 to 10%
3.2     Primary Chamber
Construction    Constructed from heavy duty mild or aluminized  steel Or
equal and approved equivalent
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
Internal Construction           Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
Door Lock                             Automatic, Electric type
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
Gratings      Provided
Loading    Manual loading of waste
Primary Burner                           Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted
Blower    Provided. For supplying excess combustion air through the distribution system with speed control system
Temperature    Minimum exit 850 0C
Observation port    To be provided with protective glass type
3.3       Secondary chamber
Construction      Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
Insulation    Refractory material lining
Combustion Temperatures           Above 850 0C, controlled electronically
Gas residue or retention Time          > 2 second at minimum 850 0C
Secondary Burner                       Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                  Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                  Flange mounted
Ejector    Provided, Venturi type, for cooling the flue gases
Combustion Air Fan    Provided for supplying combustion and creating a negative drift and turbulences
Temperature    Maximum  1600 0C
3.4       Chimney
Construction      Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent                                                                 Refractory material lining
Length    10 m above ground
Bore    about 350mm diameter
Discharge temperatures             About 850 0C
Emissions      To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
Control unit                                    Fully automatic with microprocessor based control                                                                      unit (PLC) automating all operations of the                                                                      incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and secondary chambers, turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
Isolator switch                                  Supply and install isolator switch 240V, 100A for the                                                                    incinerator unit, including all necessary cables 10m
Distribution Board    Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
Wiring    Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                       Working length 20m.  Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
Fuel System                                       Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Fuel Tank                                            Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type    Diesel
Fuel Lines                                           Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m
Fuel pipe material; Special copper pipes or similar                                                                        and approved materials
4             Physical characteristics
Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions      About 1.2 x 2.2m (WxD)
5  Operating environment
Power Requirements                       240V,A/C 50Hz, single phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6. Accessories
Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
Spare parts
Burner    1 set
Fuel Filters                                         6 sets
All other spare parts                   required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
Manufacturing standards               NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards
or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
Available    Should be available locally
Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
KEMSA    For inspection and verification
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
Installation and testing    Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
Training
User training                                           On site user training on operation and daily up keep
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
Technical Documentations
User manuals                                          2 sets
Service manuals                                     2 sets
Drawings    2 sets
15        Commissioning
Testing and Commissioning of the machine to the satisfaction of the user
Warranty
Equipment      Minimum of one year after commissioning on all parts.
Equipment system                                     Nil
17.    Maintenance contract
Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

Waste Incineration Treatment Diesel Oil type Model TS150

Waste Incineration Treatment Diesel Oil type Model TS150

Main Parts List as below:

Primary combustion chamber
Secondary combustion chamber
smoke filter chamber
incinerator PLC control case
chimney, 10meters, stainless steel
Italy Oil fule burner
oil tank 300liters
with full spare parts: oil burner, air blower, temperature thermocouple

50 to 60kg/hr and 100 to 120kg/hr diesel powered incinerator

50 to 60kg/hr and 100 to 120kg/hr diesel powered incinerator.1. Capability to Incinerate the Following Types of Waste:
Household waste, glass, steel, aluminum cans and window extrudes, steel cans (crushed), timber, tires, white goods, plastic bottles, pressure packs, medical waste and quarantine waste.
2. Required Incinerating Capacity:
Approximately 4,500 tons per year. The incinerator must capable of incinerating type of waste mentioned or any combinations thereof at a rate of 3 tons per hour. The system shall be designed to run for at least five consecutive days non-stop if required.
3. Incinerator Design Requirements:
The system should be simple in design and operation, with minimal electronic components.
The incinerator and associated air pollution control technology will be:
a.Low in use of auxiliary fuel;
b.Low in electrical power use;
c.Require minimal pre-processing of Municipal solid waste;
d.The air pollution system shall comply with EU Waste Incineration Directive 2000/76 and forms part of the whole incinerator setup.
3.1 Specific Data that must be Provided with the Design
3.1.1 Incinerator Data:
a.Batch Load Capacity;
b.Primary chamber design (thickness , diameter, length, insulation , lining, volume hearth area, weight); c.  Secondary chamber design (thickness , diameter, length, insulation , lining, volume hearth area,  weight);
c.Exhaust stack design (thickness , diameter, lining number of sections, total stack length, height above base, weight);
d.Type and number of auxiliary fuel burners;
e.Fuel requirements – type, quantities;
f.Electrical power usage;
g.Electrical services required;
h.Water requirements – quantities;
i.Any other input requirements and consumables ;
j.Temperatures to be achieved to ensure suitable destruction of waste and comply with required air pollution control standards (EU Waste Incineration Directive 2000/76);
k.Residence time to ensure suitable destruction of waste and comply with required air pollution control standards;
l.Potential weight reduction (percentage) of waste;
m.Options to automatically and continuously monitor and record data such as dates, time of day, batch sequential number;
n.A temperature or visual indicator to display heat status of equipment; and
o.Details on graphic displays and / or computer recording devices.

3.1.2  Air Pollution Control System Data
a.The type of air pollution control equipment selected will comply with EU WID Waste Incineration
b.Directive 2000/76;
c.Details on the gas cleaning systems to enhance the removal of fine particles, acid gases and heavy
d.metals;
e.Details on components, such as:
quencher;
condenser / absorber;
venturi scrubber;
entrainment separator and
emissions stack(s).
Electrical power usage;
f.Any other input requirements and consumables (e.g. lime);
g.Details on graphic displays and / or computer recording devices;
h.Environmental requirements – The system would have the capacity / ability to comply with relevant air quality criteria; i.e.EU Waste Incineration Directive 2000/76. (or similar standards and criteria acceptable to the Australian Commonwealth Government Department of the Environment);
i.Specify air pollution parameters that are monitored.
3.1.3  Site Requirements for the Incinerator
a.Total land area dimentions;
b.Infrastructure required ( water supply, electricity supply drainage); and
c.Any specific environmental or climatic/meteorological factors that needs consideration.
3.1.4  Housing Requirements and Design
a.Details on requirements for a secure enclosure for the incinerator and associated air pollution control system. The enclosure will be designed to achieve occupational health and safety requirements such as: a. Free space is available on all sides and heat radiation is kept at a minimum giving the operators an:
b.easy workable environment and ventilation;
c.There are secure storage facilities for waste;
d.There are measures to avoid vermin and pests;
e.The materials will be of sufficient structural thickness for safety and to withstand sea corrosion.
4. Training, Maintenance And Instruction Manuals
4.1 Maintenance Manuals
Provide details on maintenance requirements, such as:
a.General cleaning and maintenance – frequency, skills / technical expertise required;
b.Expected life span of parts and the system as a whole;
c.Expected frequency of the need for replacement of parts;
d.Availability of parts and location of suppliers;
e.Frequency of need for major overhauls; and
f.Estimated down time required for general maintenance and major overhauls.an incinerator  for our dead animals in the farm particularly chicken.

incinerator manufacturer 200kgs/h

Waste is thermally decomposed in the primary chamber at temperatures of 800 °C +. The resulting gaseous products are completely oxidized in the secondary chamber at higher temperatures with sufficient resident time. Other specifications are as follows. A combustion chamber of waste:

* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load

* A burner of lighting which the use is limited to the ignition of waste.

* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.

* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminum and insulates bricks in order to assure a minimum temperature on   the outside sheet metal.

* Composition of the refractory


Burning Capacity

Max. 200kgs/h

Auxiliary Fuel

Diesel

Type of Burner

Monoblock automatic burners

Temperatures

Primary Chamber: 800°C ± 50°C

Secondary Chamber: 1300°C ± 50°C

Type

Static solid hearth

Material of Construction

Mild Steel

Refractory thickness

115 mm thick

Material

Refractory bricks

Insulation thickness

50 mm thick

Waste Charging

Manual

Ash Removal

Manual

Type

Static solid hearth

Material of Construction

Mild Steel

Refractory thickness

115 mm thick

Material

Refractory bricks

Insulation thickness

50 mm thick

Type

Centrifugal

Modulation

Manual damper control

Material of Construction

Mild Steel

Type of temperature controller

Digital

Finish & painting type

Double coat

Material of construction & capacity

Mild Steel/ Plastic, suitable capacity

Other Standard Accessories

Diesel oil level indicator, piping with valves & Non-return valve

Visual Checking of Fuel

Provided

No. of Burners

2 one in primary and in secondary chamber)

Type & Model

Monoblock automatic oil fired

Make

Riello

Fuel

Diesel

Fuel delivery

10 C 20 kg/h

Firing stage

1

Thermal power

118 C 236 kW

Motor power

240 W

Pump pressure

10 C 12 bar (standard calibration), Max. pressure 15 bar

Electrical supply

Single phase 220V, 50Hz.

Material of construction

Burnt bricks

Height

9 meters from ground level

install a diesel fired incinerator

incinerate mainly pharmaceuticals ( all types of dosage forms … syrups, tablets, injectables ) medical consummabables, and also biological fluids …
Capacity around 10 kg/ hour. install a diesel fired incinerator that can accommodate a batch load of up to 100 kg with a daily burning requirement of up to 500kg per 8 hour day. Industrial Incinerator to destroy
the pharmaceuticals waste like Alu, PVC,PVDC etc.Installation for burning of animal waste cost, presence, repayment terms where it is possible to buy in Russia? I am looking to for capacity between 200 -400kg
1.2FIELD PAINTING
Perform painting required for surfaces not otherwise specified, and finish painting of items only primed at the factory

1.3FIELD TRAINING
a. Submit [Six] complete copies of operating instructions outlining the step-by-step procedures required for system startup, operation and shutdown. Include in instructions the manufacturer’s name, model number, service manual, parts list, and brief description of all equipment and their basic operating features. And [Six] complete copies of maintenance instructions listing routine maintenance procedures, possible breakdowns and repairs, troubleshooting guides, and simplified schematic diagrams for the system as installed.

3.6.Performance
Preheat the incinerator for 4 hours to reach the firing temperature of 982degrees C [1800] degrees F. Weigh and record the total charge weight. Charge the incinerator at the rated burning capacity in kg pounds per hour for a period of [4] hours and operate in accordance with the manufacturer’s written instructions. Include in performance testing the operation of the mechanical charging facilities, the incinerator, the air pollution control equipment, the ash
handling equipment, and the operation monitoring facilities. Perform testing full scale for a full- operation cycle, and monitor performance to verify compliance with the contract requirements submit a report on monitoring results. Reduce the waste to a fine ash residue. Follow normal burnout procedure. After the incinerator has cooled, weigh the residue. The weight of the residue shall not exceed 5.0 percent combustible material of the total charge weight.
After clean-out, the incinerator shall not show any evidence of deterioration, such as shagged or spilling refractory, warping of parts, and discolored exterior paint.

•Control
Test the incinerator under actual firing conditions. Verify with testing that all controls function within the maximum and minimum limits for temperature or timing. Simulate actual unsafe conditions such as high temperatures and flame failure by reducing the settings for the activation of limit and safety controls.

•Shell Temperature
Operate the incinerator under normal load conditions for not less than 6 hours. After 6 hours, temperature readings of the outer shell, taken at not less than 5 random locations, shall not exceed the temperature limitation of paragraph furnace construction.
– capacity: 300-400 kg/hour
– Fuel syetem: Dual fuel( both oil and gas)

Containerized Mobile Type Medium Unit Waste Incinerator

Medium Unit – to handle an average waste production of 500 kg/day.Minimum load capacity: 600 kg.Maximum load capacity: 1,000 kg.Nominal burning rate: 55-80 kg/hr (= 440 C 640kg range per 8hour day).

Items/Model

TS50(PLC)

Picture

 

Principle

Waste Incineration Treatment

Burn Rate

Average 50-100 kg/hour

Feed Capacity

Average 200-300 kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Optional Upgrade Containerized Mobile Type Incinerator

ISO 20′ Full Container

Combustion Chamber

560L

Internal Dimensions

1000x800x700mm

Secondary Chamber

280L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

210/240V 50Hz 1P

Power

1.3Kw

Oil Consumption (kg/hour)

Average 20.4(D.O)

Thermal capacity(kw/hour)

166-332

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Oil Tank

1000L

Feed Door

60x50cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

7500kg

External Dimensions

260x160x250cm(without chimney)


Double Chamber Incinerator on sale 50-200kgs per hour(in stock)

We supply Double Chamber Incinerator with primary chamber size average 1570Liters and burnning rate 50kgs per hour,100kgs per hour,150kgs per hour,200kgs per hour.

the incinerators are now ready for shipping.

Contact with us for quick respond: +86-13813931455

Main Product List per 01 set

Primary Combustion Chamber

Secondary Combustion Chamber

Smoke Filter Chamber

Incinerator PLC Control Case

Chimney:10.0Meters

*(upgrade to Stainless Steel, free cost)

Italy oil/gas burner: 02 units

Oil Tank (if oil fuel): 300Liters

Items/Model

TS150(PLC)

Principle

Waste Incineration Treatment

Burn Rate

Average 50/100/150/200 kg/hour

Feed Capacity

Average 750kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1570L

Internal Dimensions

150x100x105cm

Secondary Chamber

750L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

210/230V 50/60Hz

Power

0.9Kw

Oil Consumption (kg/hour)

Average 20.4(D.O)

Thermal capacity(kw/hour)

166-332

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

300L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

8500kg

External Dimensions

300x160x280cm(without chimney)

BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FT CONTAINER

BIOHAZARD DISPOSAL: CONTAINER

GENERAL INCINERATOR, IDEAL FOR INCINERATION OF VARIOUS TYPES OF WASTE, FULLY CONTAINERISED IN A 20 FT CONTAINER, TO INCLUDE BUILT-IN FUEL TANK AND GENERATOR.

TECHNICAL SPECIFICATIONS: COMBUSTION CHAMBER VOLUME (M3); 0.54 m3. SUGGESTED BATCH SIZE: 60 KG, BURN RATE: 69 KG PER HOUR, AVERAGE FUEL CONSUMPTION 13 KG PER HOUR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS, WITH TEMP. MONITORING , AVERAGE ASH RESIDUE: 3%, THERMOSTATIC DEVICE: YES,
DIMENSIONS: EXTERNAL LENGTH (mm): 1520MM, EXTERNAL WIDTH (mm): 920MM, EXTERNAL HEIGHT (mm): 4020 MM
1. Incinerator for Bio-Medical Waste incineration needed
2. 50 kg/hr
3. 2 chambers must be there
4. temperature of primary chamber should be 850 degrees Celsius
temperature of secondary chamber should be 1200 degrees Celsius

How you can find reasonable incinerators for your local site?

Hiclover supply medical waste incinerators with capacity 10kgs per hour to 500kgs per hour. 

The incinerator with dual/double combustion chamber and dry filter chamber, two fuel burner from 

Italy manufactured, hot sale model for small scale waste output, the capacity is 30kgs per hour 

and 50kgs per hour.

We are famous small scale incinerator manufacturer and brand, dispatch incinerator products 
and best services with lower price for customer all around the world.

 How you can find reasonable incinerator for your local site?

Incinerator is not a cheap equipment, generally the small scale model’s price around $5,000usd per unit 

and large scale model’s price more than $50,000usd per unit. So, before purchase one unit incinerator, 

 you have to make clear following items:

A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of 

waste you want to treatment?

B, small or large? This according to the waste output every day or the waste volume per 

feed time, like animal size.

C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke 

cleaner than oil fuel model. But some local site don’t have gas supply system.

And other technology items, like power(220v, 380v), waste feed door type, incinerator structure, etc.

WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm