Incinerator with Capacity of destruction in weight: 60 Kg/h.

Capacity of destruction in weight: 60 Kg/h.

It should be able to operate not less than 10 hours/day

This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…

Design Specification : Types A, B, C, D, and E of medical waste 

“PYROLYTIC” combustion, by controlling the gasification of waste.

The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.

It should be able to reduce the volume of wastes by 98%.

It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

The incineration should be completely free from visible smoke as well as offensive odours.

The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg

The Temperatures of combustion: Minimum will be 850oC and max 1400oC

Post combustion: >1100oC.

The Internal diameter of the Chimney: Ø 400 and its height: 8 m

The Volume of the combustion chamber: 1.200 L

The Dimension of the door for loading in cm: 70×70.

Burner operation should be Automatic On/Off

Fuel : diesel

The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” combustion must have:

A combustion chamber of waste:

* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load 

* A burner of lighting which the use is limited to the ignition of waste.

* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.

* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on   the outside sheet metal.

* Composition of the refractory;

Refractory concrete :

. Thickness : ≥100 mm

. Nature: 42% of Al203

Insulate in fibrous panels :

. Thickness: ≥75 mm

Nature: Calcium silicate.

* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding  plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, avoiding the fixing of glass and slags. 

negozio tiffany milano the whole of Europe has 423 waste incinerators

Among them,tn, the steel industry produced two? English number is much higher than normal number of waste incineration. � stone hillsIncineration plant turned landscapeIn recent years, with advances in technology, incineration, waste incineration plants living abroad to implement a large-scale restructuring, through higher environmental standards to transform the old incinerator, off a small plant, built manufacturers make incineration plants to scale,veste barbour homme, large-scale development.According to statistics,outlet hogan, in 2010, there are 35 countries and regions have built more than 2,barbour femme,000 lives incineration plant,air jordan 4 retro rouge noir, mainly in Europe,barbour international, the United States, Japan and other developed countries and regions. Interestingly, many of the incineration plant is not only a waste disposal facilities, but also because of new and unique designs, a local landmark, has become a beautiful landscape.As of the end of 2009, the Japanese waste incineration rate has reached 79.8%; the whole of Europe has 423 waste incinerators, burning about 0.25 kg per capita / day; Germany, Canada and other countries, to be buried in the ground for decades to re-dig the garbage incineration power generation; the United States a total of 220 units of existing incinerator, the total size of 93,943 tons / day waste incineration capacity is 2 times China over the same period.2010 statistics.

the very fact that what is happening behind the let unexpected. This gentleman seems to sit down, “restless”, not only accounts for part of the very fact that the position, but after the car has been in his legs from side to side, occasionally touch the very fact that the legs on her husband to send in information Ms. Zhang said, “this man next to me,abercrombie paris, half of my fork legs to the seat.” The very fact that the husband is very angrily to the very fact that the reply “What?” “Be careful purse, had sent me JIAJIANG information,abercrombie paris, I’ll pick you up. “” behind the vacancy,abercrombie, then another location “and other information. However.

there are 35 countries worldwide and has more than 2,barbour paris,000 regional solid waste incineration plants, mainly in Europe, the United States, Japan and other developed countries and regions,giuseppe zanotti pas cher, and 70-90% of household waste are incinerated deal with.Beijing News reporter Rao Pei edition have writtenInformation provided / Beijing Municipal Administration Commission(Original title: end of next year Beijing will be 23,000 tons of waste pr”Popping”,abercrombie paris, a loud slap startled passengers in the car, with a surprised look, we have looked toward the source of the sound, and saw a young woman standing on the seat face angrily, sitting next to her of a man then burst into his mouth and shouted, “hey, you do not misunderstand!” “I do not tell you to say, we went to the police station, your hair almost white people how to draw this also stem thing? “the young lady angry riposte.Approximately at 17:00 on the 10th, two from the Shaw Dam tour bus stop, directly to the Shaw Dam police station. In the police station, the young lady told reporters about what was going on.Ms. Zhang is Leshan, some time ago because of the things the company was sent to Chengdu meeting. At 14:00 on the 10th, the very fact that the new South Gate Station from Chengdu, Leshan back car ready (microblogging),nike tn soldes, to board the bus after a place to sit near the window, a man got into it, in a patrol car After the circle sat down next to Ms. Zhang’s. “He sat down and put my seat back also accounted for one-third, and the legs Zhang very open, I think I also relatively thin, give him a little nothing.” Miss Yu Shizhang Wanglibian squeezed,giuseppe zanotti, pulled out his cellphone and her husband and friends.However.

since the people in the car were full,moncler pas cher, so for the position is not very convenient, a little woman man style Ms. Zhang said:. “Aging mother to see him do tricks wisdom, you incomes for tax, I pretended to sleep.”After about 20 minutes the bus departure, the man began to intensify,tiffany outlet online, but the very fact that all this is seen in the eyes. “He put his black bag on your lap, and then the following outstretched hand from the bag and began to touch just about to take it back,parajumpers homme, to test a few times after the beginning of touch.

by: http://voipshoip.com/negozio-tiffany-milano-the-whole-of-europe-has-423-waste-incinerators/

Adjumani Hospital incinerator blows up

ADJUMANI.
The incinerator at Adjumani Hospital, which was built four years ago, has burst due to overheating.

For the past four months, support staff at the hospital have been dumping medical waste within the enclosure of the incinerator instead of burning it.

The hospital administrator, Mr Michael Ojja, told Daily Monitor on Wednesday that the incinerator broke down due to continuous burning of accumulated waste from the hospital.

“The waste has increased due to the overwhelming number of admissions and people visiting the outpatient department. But we need to find solutions to protect the staff and environment,” Ojja said.

The hospital medical superintendent, Dr Dominic Drametu, said they had asked the government for construction of a new incinerator.

He said the incinerator was too small to dispose of the hospital’s voluminous medical waste.

Patients admitted to the general ward next to the incinerator expressed fear of infections arising from poor disposal of hazardous medical waste.

According to the 2013-2014 annual health sector performance report, Adjumani Hospital registers 11,731 in-patients, 83,953 outpatients and 1,695 deliveries.

Scientific facts
Incineration of heavy metals or materials with high metal content (in particular lead, mercury and cadmium) releases toxic metals to the environment and the burnt medical waste contains micro-organisms that are potentially harmful to human beings, according to WHO.

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day 
Control: Built-in data recording
Operating temperature: Incinerator 
/Primary Combustion Chamber
Primary Chamber: 900 – 1200 0C

Type: continuous loading, Top Loading
Capacity/Burn rate per hour: 250 -300 kg/hr 
Material:
External- 3 layers 
Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock
Secondary 
Combustion 
Chamber:

Type: horizontal/vertical
Temperature:  1200- 1300 oC
Residence time of gases : >2 seconds
Ash Residue: <5% of original waste size
Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash
Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity
Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc 
Auxiliary device: Fuel cut-off device
Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                      
Chimney (Stack):
Type: Vertical type
height:>7 meter’
Material: Fireproof cast, stainless steel
OUTPUT: 
GAS- SMOKELESS,ODORLESS 
ASH -Max <5% of original waste size
Reduction of Pollutant gas SO2, HCL, HF and line particulate
Emission standard:
WHO/ European
Test report for emission testing provided?
Heat exchange mode: Automatic

Accessories:  
All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).
Operating Environment: 
The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)
Power Requirement:
220 Vac single phase or 380 Vac three phase 4 wire system  50HZ   
Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.  
Supplier shall provide the following documentation    
User (Operating) manual in English. 
Service (Technical / Maintenance) manual in English. 
Certificate of calibration and inspection from factory. 
Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. 
Training: Supplier is able to provide training on operation, management and maintenance of incinerators.   
Warranty 
Comprehensive warranty for minimum 2 year. 
Maintenance Service during Warranty Period 
During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. 
Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) 
Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning 
Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; 
Lay outs (drawings) and  pictures of the incinerators to be installed 
 Length, width and height of incinerator,
 Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed 
Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; 
Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.);
 Chimney specifications to be used for the roof design ( size, support needs, insulation); 
Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; 
Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.
Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. 
Delivery time (DAP, Addis Ababa) in weeks
Name of manufacturer including website of the manufacturer &/ supplier & country of origin

Bangor’s former incinerator property is not for sale, authority officials say

The Bangor Borough Authority will not sell the former incinerator property. Not right now, at least.

The board voted Thursday evening to support authority Chairman Donald Butz’s Oct. 2 letter to borough council President James Kresge that stated the authority need to not sell the incinerator and the surrounding home now identified collectively as the Bangor Company Park.

“Too lots of individuals had challenges with the sale,” Butz mentioned.

Negotiations were underway in the summer season that would have had the authority sell the lengthy-dormant 79-acre lot for $1.075 million to Valley Industrial Properties.

Officials discussed plans with V.I.P. who wanted to fill the deep valleys and level the steep slopes of the Ridge Road house to make it suitable for development, stated authority Administrator Marino Saveri in June.

Even so, some residents and borough officials expressed concern that dirt and landfill possibly hauled in from out of state by V.I.P. could have a potentially adverse environmental effect.

Butz decided to create a letter to the borough asking for a meeting concerning the property shortly after the authority’s September meeting when far more than a dozen residents spoke out against the sale to V.I.P.

“I will be recommending at the next authority meeting that the authority cease all activities in regard to the sale of the properties of the Bangor Company Park, and to meet with representatives of the borough council in regard to the properties,” Butz’s letter study in part.

David Houser who serves on each the borough council and the authority was the only vote on the board not in support of Butz’s letter. Houser has expressed sympathy in the previous with these who have been against the sale to V.I.P. and he did not really feel the letter had enough teeth to be meaningful.

“The letter is open-ended,” Houser said. “It doesn’t specify any dates.”

As long as the authority is in possession of the incinerator home, a sale to a landfill hauler is still achievable, mentioned Anna Maria Caldara, a Bangor resident who has been a vocal opponent of the property’s sale.

“We need to have assurances from the authority that their perspective has changed,” Caldara stated right after the meeting, “and from this point forward we need to have to know they take sustainability seriously.”

Authority and borough officials met to discuss the Bangor Company Park on Oct. 23. Any eventual plans or discussions of sale will be done in coordination with the borough council, according to Saveri.

“If we do something in the future, we will do it in conjunction with the borough,” Saveri mentioned.

The authority also voted without objection to reimburse $14,000 to Nimaris Building, which had spent dollars on various engineering permits at the incinerator website in recent years. Authority officials told Nimaris that they would get their income back if a sale did not go by means of, according to Saveri.

The house will stay dormant and closed for now. Hunters and neighbors of the property frequently make their way past the fences and really should be aware that police will be patrolling the home and trespassers will be prosecuted, Saveri said.

Our editors found this article on this site using Google and regenerated it for our readers.

Bid to burn waste from out of town in Newhaven Incinerator

Veolia is seeking to source non-recyclable commercial and industrial waste for its Newhaven Incinerator from areas neighbouring East Sussex and Brighton and Hove.

It argues this will allow the incinerator to produce enough energy to power 25,000 homes continuously.

But cllr Rod Main from Newhaven said this would lead to more trucks and pollution.

Veolia applied for planning permission to East Sussex County Council to lift a planning condition to enable the scheme to go ahead.

General manager for Veolia in South Downs Allan Key said the company wanted to extend the catchment area outside East Sussex and Brighton and Hove.

He said it would not lead to physical changes at the incinerator or increase to the 242,000tpa capacity.

Mr Key said: “Energy demands are going to increase year on year. Facilities such as the one we have here in Newhaven recovers energy from waste that would otherwise be lost by going to out of county landfill.”

Cllr Main said: “They need more waste to help ESCC’s carbon footprint by pumping more carbon dioxide into the atmosphere (and it’s around 100,000 tonnes pa now) not to mention how many more trucks will be coming right across Sussex from who knows where adding to the pollution.

“It’s helping to power 25,000 homes. There’s a proposed wind farm just off the coast which might power 20 times that and it won’t be pumping 100,000 tonnes of CO2 into the atmosphere every year for the next 20 or more years.”

by: http://www.sussexexpress.co.uk/news/county-news/bid-to-burn-waste-from-out-of-town-in-newhaven-incinerator-1-6388465

Incinerator with Capacity of destruction in weight: 60 Kg/h.

Capacity of destruction in weight: 60 Kg/h.

It should be able to operate not less than 10 hours/day

This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…

Design Specification : Types A, B, C, D, and E of medical waste 

“PYROLYTIC” combustion, by controlling the gasification of waste.

The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.

It should be able to reduce the volume of wastes by 98%.

It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

The incineration should be completely free from visible smoke as well as offensive odours.

The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg

The Temperatures of combustion: Minimum will be 850oC and max 1400oC

Post combustion: >1100oC.

The Internal diameter of the Chimney: Ø 400 and its height: 8 m

The Volume of the combustion chamber: 1.200 L

The Dimension of the door for loading in cm: 70×70.

Burner operation should be Automatic On/Off

Fuel : diesel

The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” combustion must have:

A combustion chamber of waste:

* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load 

* A burner of lighting which the use is limited to the ignition of waste.

* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.

* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on   the outside sheet metal.

* Composition of the refractory;

Refractory concrete :

. Thickness : ≥100 mm

. Nature: 42% of Al203

Insulate in fibrous panels :

. Thickness: ≥75 mm

Nature: Calcium silicate.

* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding  plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, avoiding the fixing of glass and slags. 

Texas Ebola waste will not be disposed in Louisiana

On Friday Attorney General Buddy Caldwell announced the State of Louisiana reached an agreement with Texas incinerator Veolia Environmental Services and Louisiana hazardous waste landfill Chemical Waste Management to ensure that incinerator ash associated with the recent Dallas Ebola virus occurrence will not be transported or disposed of in Louisiana, .

On Oct. 13 the Louisiana Attorney General’s office obtained a restraining order in the 19th Judicial District Court to temporarily stop the transport of incinerated Ebola ash into Louisiana.
The temporary retraining order was extended on Oct. 21 at the request of all parties, before ultimately arriving at today’s agreement.

Attorney General Caldwell said, “I am pleased today’s agreement ends this chapter in the controversy of the transportation and disposal of Ebola waste.”

Campaigners welcome Heathrow’s plans to move incinerator

Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around the town.

The airport said it altered its plans after residents raised concerns over its plans to relocate its incinerator to the Bedfont Road area.

A Labour county councillor however has said it is like moving pieces around a chess board.

Stanwell and Stanwell Moor councillor Robert Evans said: “I welcome very much the changes and that is due to the pressure put on BAA by me and the Labour party.

“But local resident Andrew McLuskey has done all the hard work.

“But in saying that, we are still battling away to stop expansion happening at Heathrow at all.

“There are still serious reservations and I don’t believe an expansion of the airport is right for the area or the whole country.

“We are talking semantics here – it’s a big expansion in a very cramped area. It’s like moving pieces around a chess board – whatever we don’t like around Stanwell will be just as massive somewhere else.”

Changes to the plans include introducing a 15 mile ‘green corridor’ which will increase the amount of recreational space between the town and a new car park south to the airport – which has also been reduced in size.

A new park and an all-weather sports pitch is being mooted for the area, as well as the potential building of ‘balancing ponds’ to help control the release of floodwater.

Roberto Tambini, chief executive of Spelthorne Borough Council, said: “We are delighted that Heathrow has listened to and acted upon our feedback in creating its updated expansion plans and that the residents of Spelthorne have been offered an improved deal as a result.

“I am sure that we can work together and that Heathrow will continue to listen to Spelthorne residents and demonstrate a flexible approach to future proposals.”

Some of the £16 billion of private money being invested will also be used to support the Environment Agency in developing flood prevention schemes to protect homes and property in the surrounding areas.

The airport has also announced plans to fund a new bypass to replace the existing A3044 at Colnbrook and Poyle to ease congestion issues.

John Holland-Kaye, chief executive of Heathrow said: “The expansion of Heathrow can bring significant benefits for local people as well as the UK economy.

“As well as bringing 50,000 new jobs and 10,000 apprenticeships, we can also improve the environmental landscape around the airport and mitigate some of today’s problems including road congestion and flooding. We continue to improve our plans based on the feedback we receive.”

The Airports Commission is currently assessing the case for expansion of either Heathrow or Gatwick.