Automatic filling and refilling with capability of 10 to 12 bunches per day working with gas therapy techniques and gas fuel and also ought to comply with the European Standards.the Federal Government Healthcare Facility for Medical Waste Incinerator with the adhering to Specifications. they are having basic wastes like cells, plastic bottles etc, wastes originating from work camps, to be incinerated, they require, 50kg/hr incinerator
MEDICAL WASTE INCINERATOR.our healthcare facility produce 40 kg daily from all waste product
–– Capability: 1000 kg/h
–– Kind waste: industrial waste
–– Other demands: Automatic waste filling system and exhaust therapy system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2 humans resources.
4. Gas consumption: 7 litres per set. Incinerator with the ability of treating in between 300 & & 500 kgs fitted with the wet scrubber system.complete Burner with an ability of 500kgs/ hr with a wet scrubber device. a 10-20Kg per hour of residential waste? Likewise, I would like to understand what is the minimum ability burner you have in instance we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capability as I am in ownership of a huge quantity of mixed/municipal waste (4/5 million tonnes) of the following make-up (52% natural, 12% plastic, 16% paper, 6% metal, 4% glass and also 10% other). The EU codes of the waste are as complies with: 20 03 01, 19 12 10 and 19 12 12.
Among the vital making a decision aspects of the prospective distributor is the energy usage of the strategy, showed either per hr or daily and also I would certainly appreciate if such information can be made available.
Apr, 2025
Capability of destruction in weight 60 Kg/h
clinical waste incinerator solutions as well as costs for 100 bed/ 500 bed/ 1000 bed/ 3000 bed healthcare facilities.
– – Assumption: general medical facility beds 50%, operation beds 50% for the 100 bed health center situation, while this
ratio is 30-70% for the other situations
–– global criteria and also waste productions assumptions ought to apply
INCINERATOR, DIESEL.
CAPABILITY: Burner 150 kg/hr.
Amount: 2 [2] with total accessories.
Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic
plastics,
natural rubber, synthetic rubber, polyurethane sheet, and cumbersome films, solids and also
– – fragments that can be easily arranged
– – Things that easily deteriorate such as paper, timber, natural leather and garbage
– – Chemical waste solids and also liquids, waste oil and also various other difficult-to-handle items
The devices will certainly be licensed for operation from PME after passing site investigations.Manual tons double chamber
burner for clinical waste to melt 50kg/hr on constant procedure, with Main temperature level approximately
800degC minimum and 1200degC or even more in the Additional chamber, full with billing door, Ash door, Air as well as check out
ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to
meet NEMA requirements as well as various other global requirements. Здравствуйте! Меня интересует пе
чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж
ду ответа. Стоимость и доставка до г.Алматы Казахстан
The technical details we respect are:
–– Capability (burning capacity of waste per hr). 150kg/hour. Burner with 300l waste chamber
–– Build products, 5mm Excellent quality light steel construction; 100 mm excellent quality refractory lining.
–– High Temperature paint finish.we have 2 hospitals, more after that 20 dentist offices, and also over 50 physician workplaces.
would certainly it be feasible to give us information on the ability of burner we require
on this island.
–– Approximately 150 KG/Hrs. burner to dispose our day-to-day regular death for this size of the ranch.1. can the
100kg/hr melt solid waste/hazardous waste like expired paints, waste oil or chemicals.
2. What about the warm created during burning, are there windows or air circulation right into the containers.
–– Intake of power and also gas. medical facility garbage disposal system for a medical facility project
–– Ash removal odor.The burner is for CONTAMINATED MATERIALS and SOLID WASTE and also marginal carbon discharge.
–– Automatic treating process temperature regulated chamber.Incinerator with 150l waste chamber
–– Second chamber.
1. Do you have plans for above incinerators revealing flooring dimensions, height. BURNER FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2. What products should be utilized for the FLOOT, WALLS, ROOFING SYSTEM ETC. 1) The only consumable needed for the system TS100
(PLC) is Oil( diesel) is that OKAY?
2) from your technological requirements: oil intake (Kg/hour) is between 14–– 28) do you suggest is liters/hour?
example the incinerator will be operating for 10 hours daily indicates the oil usage will be ~ 140 Litres or even more?
3) Chimney type stainless steel. just how around main body building and construction materials?if there are a lot more two alternative of text
building and construction materials for better lifetime
3. Send out information concerning electrical power, ventilation, fire protection, wears down, chimney etc
4. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg capability design, MP 500
clinical incinerator.
5. We see you have container shelters. Send us value quote for this item
1. Capability of damage in weight: 60 Kg/h.
2. It must have the ability to operate not much less than 10 hours/day
3. This incinerator should have the ability to destruct all combustible wastes created by medical facilities, exclusive facilities,
laboratories, institutes, etc.
4. Layout Requirements: Types A, B, C, D, as well as E of clinical waste
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to stay clear of the launch of black smoke as well as fine dust, (Electric) throughout the loadings.
7. It must have the ability to reduce the volume of wastes by 98%.
8. It ought to be able to hold exhaust in the 2nd melt with gas house of not less than 2 seconds.
9. The incineration must be totally devoid of visible smoke in addition to offensive odours.
10. The reduced calorific power (L.C.P) of this waste will be 3,500 kcal/kg
– The Temperature levels of burning: Minimum will be 850oC as well as max 1400oC
– Message combustion: >> 1100oC.
11. The Inner diameter of the Smokeshaft: Ø 400 as well as its elevation: 8 m.
12. The Volume of the burning chamber: 1.200 L.
13. The Measurement of the door for packing in centimeters: 70×× 70.
14. Heater procedure should be Automatic On/Off.
15. Fuel: diesel.
16. The supplier has to give essential details for the very best of the installment.
This burner with “PYROLYTIC” burning should have:.
17. A burning chamber of waste:.
* Flawlessly tight door for the hand-operated loading of waste. The loading should be Guidebook, Set Tons.
* A heater of illumination which the usage is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, as well as packing protecting
out of refractory.
* The insulation of the burning chamber ought to be made up of refractory bricks, having a high content of aluminium
and also insulates bricks in order to ensure a minimum temperature on the outdoors sheet metal.
* Make-up of the refractory;.
– Refractory concrete:
. Density: ≥ 100 mm
. Nature: 42% of Al203.
– Shield in fibrous panels:
. Thickness: ≥ 75 mm.
– Nature: Calcium silicate.
* Burner of lights of waste, with fuel, standard mono-bloc casting directing diving flame, lights and security of
digital ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
* Plate of combustion in Carborundum, staying clear of the dealing with of glass and slags.
18. A chamber of article burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting an overall re-combustion of gases,.
* A gadget of air inlet of air conditioning of waste gases,.
* A sheath of discharge of the gases scorched.
* Carcass in strong sheet steel with support of link.
* Composition of the refractory;.
– Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– Protect in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heater with gas, mono-bloc casting guiding type with horizontal flame, lighting as well as safety of digital
ignition, long-term air flow, electromagnetic sluice entrance of regulation and isolating valve.
* A secondary injection of air to guarantee excellent oxygen web content.
19. A control box making certain the total cycle of burning.
20. Follower:.
* Electro-ventilator distributing the secondary air, the policy of the air circulation being executed by valves and also
following the control of the automatic cycle.
21. Controls as well as policies:.
Control box watertight to dirt, consisting of:
* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.
21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on
set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc
Apr, 2025
HIGH TECH PYROLYTIC MEDICAL WASTE BURNER
ADVANCED PYROLYTIC MEDICAL WASTE BURNER
1. Ability of damage in weight: 60 Kg/h.
2. It should have the ability to operate not much less than 10 hours/day
3. This burner needs to have the ability to demolish all flammable wastes produced by health centers,
private centers, research laboratories, institutes, etc…….
4. Design Spec: Types A, B, C, D, as well as E of clinical waste.
5. PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to prevent the launch of black smoke as well as fine dust, (Smokeless) during the.
loadings.
7. It should be able to minimize the quantity of wastes by 98%.
8. It should be able to hold exhaust in the second burn with gas residence of not much less than 2 seconds.
9. The incineration should be entirely devoid of visible smoke in addition to offending odours.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg.
– The Temperature levels of combustion: Minimum will be 850 ° C and also max 1400 ° C. – Message combustion: > > 1100 ° C.
11. The Inner diameter of the Chimney: Ø 400 as well as its elevation: 8 m.
12. The Quantity of the combustion chamber: 1.200 L.
13. The Measurement of the door for packing in cm: 70×× 70.
14. Heater procedure need to be Automatic On/Off.
15. Fuel: diesel.
16. The vendor has to provide necessary information for the very best of the installation This incinerator.
with “PYROLYTIC” combustion should have:.
17. A burning chamber of waste:.
* Perfectly tight door for the hand-operated loading of waste. The loading ought to be Guidebook, Set.
Tons.
* A heater of illumination which the usage is restricted to the ignition of waste.
* Frontage of filling with door seals increased on hinges, wheel of screw plug, adaptable joint, and also.
packing protecting out of refractor.-.
* The insulation of the combustion chamber must be made up of refractory bricks,.
having a high material of aluminium and shields blocks in order to ensure a minimum.
temperature outside sheet steel.
* Structure of the refractory;
– Refractory concrete:.
> > Thickness: > > 100 mm “.
> > Nature: 42% of A1203.
– Protect in fibrous panels:.
> > Thickness: > > 75 mm.
> > Nature: Calcium silicate.
* Heater of illumination of waste, with gas, conventional mono-bloc casting leading plunging.
flame, lighting and also safety and security of electronic ignition, permanent air flow, electro-magnetic sluice.
gateway of regulation and isolating valve.
* Plate of burning in Carborundum, preventing the dealing with of glass as well as slags.
18. A chamber of article burning of gases.
* A heater of burning of gases,.
* A gadget of shot of air permitting a total recombustion of gases,.
* A device of air inlet of air conditioning of waste gases,.
* A sheath of evacuation of the gases charred.
* Carcass in strong sheet steel with assistance of connection.
* Structure of the refractory;.
– Refractory concrete:.
> > Thickness: > > 150 mm.
>> Nature: 65% of A1203.
– Insulate in fibrous panel:.
>> Thickness: > > 85 mm.
>> Nature: Calcium.
* Heater with fuel, mono-bloc spreading guiding kind with straight fire, illumination and also safety of.
electronic ignition, long-term ventilation, electromagnetic sluice entrance of guideline and also separating.
valve.
* An additional shot of air to make sure excellent oxygen web content.
19. A control box making sure the complete cycle of combustion.
20. Fan:.
* Electro-ventilator dispersing the secondary air, the guideline of the air flow being.
carried out by valves as well as following the control of the automatic cycle.
21. Controls as well as guidelines:.
Control box watertight to dirt, including:.
* A button breaker for every engine (ventilators and heaters).
* A timer with adjustable temporization for the policy of each heater.
* A regulator with watch for the temperature level of combustion,.
* A regulatory authority with watch for the temperature of postcombustion.
* Electric box.
21. The de- ashing needs to be performed in all-time low of the burning chamber or the deashing.
ought to be Automatic or hand-operated set de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional
23. Discharge Standards Compliance: BS 3316 or comparable conventional
23. Ability to treat Plastic: Not much less than 40% by weight
24. CE Production Conformity: BS EN 746-2-1997
22. The supplier should give sets of extra parts of very first necessity as well as consumable of the.
incinerator.
23. The installed burner has to birth a one year warranty.
24. The supplier will perforn an onsite installation of the burner.
25. The technical training of drivers will need to be provided and also provided by a professional from the.
manufacturing facility; it will certainly consist of medicinal as well as precautionary maintenance, and making use of equipment, etc
NB.; Civil works as well as any various other relevant solutions for the installment as well as training of drivers need to be included in the burner’s rate.
Requirements for the shelter of the burner:
House of the incinerator comprehensive in deal (your house must have toilet as well as hand washing centers and also firefighting). The dimension of the shelter shall measure 4 meter by six meter and shall be offered with appropriate air ventilation.
This material as well as equipment must include in the shed of the burner: foundation in debris rock, isolation roof covering versus humudity; elevation with block of 20 centimeters (bloc concrete), continuing lintel (linteau) in strengthened concrete; steel framework (charpente en metal); roof covering in sheet B.C.A. 28 BG
Apr, 2025
cytotoxic waste
Our passion is for disposing primarily cytotoxic waste, specifically out of date or out of specs cytotoxic drugs. Various other wastes for which we wish to get rid of in addition to the cytotoxic waste includes outdated or out of specs psychotropic pharmaceuticals (but not always narcotics), sharps (needles) and so on.
It is additionally really important for us to understand if the device is qualified to deal with cytotoxic waste and also the characteristics as well as disposal of therapy deposits. Furthermore, operational requirements in regards to energy and also gas intake, along with particularly the off-gas therapy system applied, birth considerable value, as meeting the needs of Guideline 2010/75/EC is normally necessary.
The quantity of disposal is about 100 kg per day as minimum. Bigger capabilities approximately 500-600 kg/d are likewise of terrific interest to us. Hence, please send us your proposition for both aforementioned day-to-day abilities.
Apr, 2025
BIO WASTE INCINERATOR
50 kg/ hour capacity incinerators
· Burning Rate: 50kos/hr
· Feed Capacity: 150kqs
· Primary Combustion Chamber: 900 liters
· Secondary Combustion Chamber: 300 liters
· Mix Combustion Chamber: Yes
· Smoke Filter Chamber: Yes
· Feed Mode: Manual
· Power: 0.7Kw
· Fuel Type: Diesel Oil/ Natural Gas/LPG
· Internal Dimensions: 120 x 90 x 85cm (primary chamber)
· External Dimensions: 200 x 160 x 310cm (without chimney)
· Burning Efficiency: >98%
small scale medical waste incinerators.The required burning capacity of those incinerators are 10 kg and 15 kg/hr .The fuel oil using for those incinerator is diesel oil .
Apr, 2025
Refractory Concrete Incinerator
2 medical waste incinerators model YD-50, 150 kg feed capacity, 220/380 V, 50 Hz c/w 5 mtr. chimney.
Bio-medical waste management plant requirements:
Disinfecting/sterilizing the contaminated medical wastes, main combustion chamber, post combustion chamber, heat exchanger, ash removal units and flue gas treatment systems, with the following details:
Hourly capacity of the system: from 250 up to 500 Kgs/ hour
Duration of operation: from 14 up to 18 hrs/ day
Fuel type to be used: Diesel or alternative
Calorific value of the waste: 3500 up to the maximum limit kcal/ Kg
Minimum operating temperature of primary chamber: 1000 degrees celcius
a smaller capacity of 150 to 250 kg/feed capacity
will be good for comparison. Our main byproducts are the slaughtered unwanted carcass.
• Using diesel as fuel
• Capacity 50kg per hour
• chambers material: Refractory Concrete
• Number of chambers: Two
• Manual feed
solicito un horno crematorio para mascotas, de una capacidad de 80 kl, aprox. solo una unidad, especificaciones tecnicas, totalmente industrial, atte. erika martinez peru
Apr, 2025
waste disposal burner
Incinerator but the dimension of chamber > > 2000 x >> 1200 mm. Get ready for melt FLUID Waste +/- 20 liter/hr.
Fueled by Heavy OIL Burner.waste disposal burner, efficient in managing both wet as well as dry waste. Which include house hold wastes as well as dry fallen leaves.
The chamber of the incinerator ought to have the ability to hold about 200 – – 250 kg of waste at an offered time. edical Waste Incinerators.
The mobile system is our concern then the fixed systems. Medical Waste Incinerators. The mobile system is our priority then the fixed units.
a; Batch Capacity for each version, just how much lots can we place in one-time. I require tio under stand in term of set lots once I can ut in Kgs.
b: Burning capability per hour, to recognize how much time it will certainly require to shed one set and what is cooling timem for each one.
c: How many batch can we place in every day basis per 24-hour.
d: The majority of systems will certainly be worked on Gas, so I need to recognize the required pressure of gas in psi to run the system without any problem.
e; I do wish to recognize an average life of system and also after how many years we need the repair work of linning etc.
2. What is your minimum capability and also maximum capability burner.
3. You do give secodn hand burner in good working problem.
4. We require just dual chamber dual burner incinerator.
5. Please send us DEFRA and also DADR authorization records by attachment, copy of ISO and also recap of gas emmission report from incinerators.
Apr, 2025
Heater capability of destruction of 350 kg/hour
common daily massacre involves 120 pigs. The Condemned item as well as also byproducts from the abattoir for disposal is around 1000 kgs.daily
one line incinerator for the destruction of harmful clinical waste.
– – – – Heater ability of damage of 350 kg/hour, calorific well worth of waste will definitely be 13-25 MJ/kg
[3,500 kcal/kg] and also ideal cozy ability 1,225,000 kcal/hr.
– – – – Burner damages ability will definitely be 8.4 tons/day and additionally procedure time will definitely be 24 human resources./ day.
– – – – Waste will be with automatic feeding system right into the burner.
-The temperature degree will definitely regulated in varying flow and also portion in oxygen, burning gas is re-burned
in the re-combustion [additional] chamber at a temperature level of minimum 1,100 C throughout 2 secs.
– – – – Control board will certainly be fitted with an useful synoptic sight revealing the operating circumstance of the whole
heater and also handled by DCS/PLC system.
– – – – Gas therapy system will absolutely appreciate the EE standard [Directive 2000/76/EC -4/ 12/2000.
– – – – TOC of slag as well as bottom ashes will certainly be much less 3% of the dry weight.
– – – – Arrangement will certainly be completely free from visible smoke.
– – – – Heater will certainly be created as a Packaged system, having electric link pre-wired and last pipelines
in position.
– – – – Incinerator will have automated de-ashing system with upward direction.
– – – – Burner will certainly have flue gas therapy system comprehensive [emergency situation by-pass pile, gas cooling system,
two activators as well as also particulates filtering system] as well as assurance of discharges out of burner.
– – – – Training of AKU workers at website.
– – – – Web site could be reviewed as well as likewise take a look at existing ATI manufacturer, capability 150 kg/hr. in 1 day treatment.
– – – – Existing facilities space is conveniently available in basement, 100′ ′ Size x 30 ′ large x 20 ′ Altitude for 2nd Incinerator.
– – – – Existing smokeshaft size is 12 meter, and also size is 24″ ″ dia.
Apr, 2025
little array incinerator of shedding capacity
Chicken Burner – – – – 400 kgs feed per day.a tiny scale incinerator of shedding capability 30kg/hr= 1No. Note that it needs to be mobile as this is meant for oil areas service tented camps. It has to be diesel operated as our location is remote. 150! kg per human resources LPG electric burner to be utilized at the international airport. This is a requirement bu the biography safety and security and also security that all global flights need all rubbish sweltered within a recognized time.Required lots ability is 150Kg
Chamber – – – – Primar 900 liters Additional: 300Litres
Smokeshaft 8M
Burning Cost: 50kgs/hr Yes.
Feed Capability: 150kgs Yes.
Key Burning Chamber: 900 litres Yes.
Second Combustion Chamber: 300 litres Yes.
Mix Combustion Chamber: Yes Yes.
Smoke Filter Chamber: Yes Yes.
Feed Setting: Manual Yes.
Power: 0.7 Kw Yes.
Gas Kind: Diesel Oil/ Natural Gas/LPG Yes. Various Price if oil or gas fuel.
Internal Dimensions: 120 x 90 x 85cm (trick chamber) Yes.
Outdoors Dimensions: 200 x 160 x 310cm (without smokeshaft) Yes.
Burning Performance: >> 98% Yes
Apr, 2025
eco pleasurable burner
50 bed medical care center as well as additionally would enjoy to have your recommendation for burner that can effectively handle the tons of 50 bed hospital.Incinerator for burnable garbage (paper & & & & natural) device ability (100/150 lts). Bio Medical Waste Incinerators,
Ability: 50kgs per hr Medical Waste Burner Design TS50 (PLC) with both choice on Fuel (Gas as well as additionally/ or Diesel2 Burners
2 Temperature degree Thermocouple
5 meters for thermal gasket
1 heater control instance
1 Blower ecologically friendly incinerator for shedding polyproplylene bags we have 10 lots weekly