little healthcare center waste incinetor


WASTE INCINERATOR

–          150 KG/HR

–          Compliant with EU rules, Directive 2000/76/EC

–          Fuel type: Diesel

–          Easy management and maintenance

–          Temperatures:

850 deg C for municipal waste

1000 deg C for medical waste

1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.a incinerator with an avarage burning capacity of 20-30kgs per hour and it should diesel or used motor oil,  MEDICAL INCINERATORS, CAP: 3 TONS.producer of small hospital waste incinetor – for our clients (hospitals)


containerised Health care center waste incinerator


One 40′ ′ ′ ′ Need – – – – containerised Heater, and likewise understand you can aid us with the purchase of the same.Waste kind or application: General in addition to Medication

Capability kgs/ human resources: 75 to 350
Clinical center and also Laboratory devices.

Among our valued customer is interested to acquire a Hospital Waste heater according to adhering to specs:

Healthcare center waste heater
Capability: 50 Kg/ Hr
Brand-new overall working system
Burners: Dual discharged (Gas and also diesel).
20ft container with an incinerator plant for melting solid waste consisting of the following important things:

1. INCINERATOR.
2. SPARK ARRESTER.
3. FLUE GAS LOT/ EXHAUST PIPELINE.
4. DIESEL OIL DAYTANK 400 L WEB.
5. INCLUDED FIRE MANAGING SYSTEM.
6. CUSTOMER’S GUIDEBOOK.
7. ADDITIONAL COMPONENTS FOR 1 YEARS PROCEDURE.
medical waste incinerator is from 2.5 to 3 cubic meters as well as additionally it’s capacity is from 60 t0 100kg per hour.


an animal cremator


a pet cremator for our organization in malaysia.currently we are doing specific personal cremation along with mass cremation for animals in addition to professional waste.a burner which can shedding in between 3 to 5 tonnes daily of blended waste things, plastics, rubber, combustible putrescible waste, medical waste, rubber tires, paper as well as cardboard, textiles, green wood waste etc. As a few of the waste products will certainly include non-flammable solids, the heater ought to be capable of removing those materials potentially making use of a revolving kiln treatment.

It is not planned to make use of any type of type of gas, such as oil or diesel, to promote the burning of the waste, as the waste items are needed to be blazed making use of a cost-free burning treatment. Warm air however from a downstream treatment will certainly be provided to enhance the heater temperature degree and also burning rate as needed. Really warms in the incinerator are not needed and also are not required.

The burning of the waste items is expected to create hazardous discharges which will certainly be cleaned up by means of other existing downstream treatments and also a Short article Burning process in the heater is consequently not required.

The burner must can fitting an automatic waste feed process.Incinerator Needs

S. No.
Summary

1
Feeding Ability
100 Kg.

2
Burning Ability
50 Kg./ Hour

3
Feed Setup
Hands-on

4
Gas
Diesel Oil

5
Burner Kind
Dual Burning Chamber with Integrated In Smoke Filter (Dry Scrubber)

6
Smokeshaft Product
Non Corrosive/ Rust Resistant Ideally Stainless for longer Life (Elevation 5-7 Meter)

7
Burners
Costs Top Quality European CE Qualified Oil Heater

8
Control board
Requirement PLC Control Panel

9
Power Supply
220/380 Volt A/c 50 Hz.

10
Oil Tank Ability
200 ~ ~ 300 Litre

11
Burning Chamber
Fire Block, Refractoy Block, Concrete


blaze biohazard waste


a burner which can melting in between 3 to 5 tonnes per day of mixed waste items, plastics, rubber, combustible putrescible waste, clinical waste, rubber tires, paper and also cardboard, textiles, eco-friendly hardwood waste etc.

It is not suggested to utilize any kind of gas, such as oil or diesel, to advertise the burning of the waste, as the waste things are called for to be blazed making usage of an entirely free burning procedure.

The burner need to be qualified of fitting an automatic waste feed process.We are seeking burner to incinerate biohazard waste of our microbiology laboratory.

The burner should be capable of fitting an automated waste feed process.We are seeking incinerator to incinerate biohazard waste of our microbiology lab. Our day-to-day waste production is upto 20 Kg maximum and incinerator will certainly be called for on regular basis that is 1 or 2 times a week so you are as a result asked for to kindly suggest the suitable incinerator for our lab which shall be affordable for us concerning investing in as well as upkeep cost.


a commercial sized incinerator for cigarette along with cigarette waste


inciner8ter variation TS50 OR TS100 With delevery in Europe look Croatia.Please can you send me the deal for pet crematory equipment.details of Chemical waste incinerator.
For pet dogs to 90 kg. cremation devices for pets (Max. Size pet dog dogs till 80 kg )1. technical requirements is for burner just
2what is the capacity of burner in one hr?
3. 35 for burners, 8 for control circumstances, 1 for HD is that the weight of each product?
4. are these currently set up to ensure that the constructing ends up being simple in between control scenario and additionally burners with HD?oil heating system, 2sets (bigger capability).
Temperature level Thermocouple, 2 collections.
Oil Tank 100Liters, 1 set.
Thermal Gasket, 10 Meters.
Incinerator control Instance, 1 collection.
Blower, 1 set.a commercial sized incinerator for cigarette and tobacco waste. Info

Brand = Any Kind Of

Variation = Any Kind Of

400v/50hz

· Kind of waste – – – – timbers, tree branches, tree leaves, timber powder as well as card boards

· Daily Humans resources of operation = 7 hrs

· Daily produce waste ability = 10000kg.
THEE SETS OF BROCHURE ORIGINAL NEED TO BE RECIVED BY DHL + CD VEDIO.
THREE YEARS ENSURE TOTALLY FREE FREOM DELIVARY DAY As Well As FREE SPAR ELEMENT ALSO, GARANTEE LATTER SPAR PART NEED TO MEAN ONE DECADE FROM THE DATE OF DELIVEARY.
ELECTRIC SYSTEM DEMAND TO BE DELIVERD WITH SERVIC MANUAL IN ENGLISH EACH.
ELECTRIC REQUIRES TO BE 380-220 V HZ 60 FOR ALL TOOLS.
SUPPLY TIME ASB.
OFFER LEGITIMACY NEED TO BE 6 MONTHS.
IN SCENARIO OF ORDER I NEED.
2 COLLECTIONS OF CERTIFICATION OF ORGINE NEED TO BE STAMPED IT FROM SAUDIA CONSULAR OFFICE IN YOUR NATION.
COMMERCAL INVOICING( LEGALIZED FRO CHAMPER OF BUSINESS).
2 ORGINAL COSTS OF LADIN.
should BE SEND SOME ONE FOR FIXE In Addition To TRANING FOR 5 INDIVIDUAL IN EACH LOCATION.
REQUIRED TO BE SEND YOUR DIZIN FOR INSTALATION UNITS.
AWITING YOUR WONDERFUL REPLY


A PYROLYTIC MEDICAL WASTE BURNER FOR LARGE VARIETY


NEEDS OF A PYROLYTIC MEDICAL WASTE HEATER FOR BIG VARIETY
1. Capability of damages in weight: 500 kg/h.
2. It must have the capability to run very little less than 8 hours/day
3. This burner should be able to wreck all combustible wastes produced by medical facilities, personal facilities, laboratories, institutes, and so on
4. Design Spec: Kinds A, B, C, D, as well as additionally E of clinical waste.
5. PYROLYTIC combustion, by regulating the gasification of waste.
6. The incinerator needs to prevent the launch of black smoke and additionally great dust, (Smokeless) during the loadings.
7. It should have the ability to reduce the volume of wastes by 98%.
8. It needs to have the capability to hold discharge in the second melt with gas house of very little less than 2.
secs.
9. The incineration should be entirely lacking obvious smoke in addition to offensive scents.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg.
The Temperature degrees of combustion: Minimum will certainly be 850oC as well as also max 1400oC.
Post combustion: >> 1100oC.
11. The Inner size of the Smokeshaft: Ø 400 and also its elevation: 8 m.
12. The Quantity of the burning chamber: 1.200 L.
13. The Measurement of the door for loading in centimeters: 120×× × × 120.
14. Burner procedure ought to be Automatic On/Off.
15. Gas: diesel/Gas.
16. The vendor has to supply required details for the very best of the installment This burner with PYROLYTIC burning require to have:
17. A burning chamber of waste:.
* Totally limited door for the hands-on loading of waste. The loading must be Handbook, Establish.
Load.
* A heating unit of lighting which the use is limited to the ignition of waste.
* Frontage of packing with door seals increased on hinges, wheel of screw plug, versatile joint, in addition to packing shielding out of refractory.
* The insulation of the burning chamber must be composed of refractory blocks, having a high product of aluminium in addition to secures bricks in order to guarantee a minimum temperature level on.
the outdoors sheet steel.
* Make-up of the refractory;.
Refractory concrete:
. Thickness: 100 mm
. Nature: 42% of Al203.
Shield in crude panels:

. Thickness: 75 mm.
Nature: Calcium silicate.
* Burner of illumination of waste, with gas, traditional mono-bloc casting leading diving flame, lighting as well as safety and security as well as safety and security of digital ignition, long-lasting air flow, electro-magnetic sluice entry of guideline and likewise isolating valve.
* Plate of burning in Carborundum, staying clear of the fixing of glass as well as slags.

18. A chamber of write-up burning of gases.
* A heating system of combustion of gases,.
* A tool of injection of air enabling a total recombustion of gases,.
* A device of air inlet of air conditioning of waste gases,.
* A sheath of emptying of the gases shed.
* Carcass in solid sheet steel with assistance of link.
* Cosmetics of the refractory;.
Refractory concrete:.
Thickness: 150 mm.
Nature: 65% of Al203.
Protect in coarse panel:.
Density: 85 mm.
Nature: Calcium.
* Heating system with gas, mono-bloc spreading assisting kind with straight fire, lights as well as safety and security of electronic ignition, lasting air flow, electro-magnetic sluice entryway of policy and isolating shutoff.
* A second injection of air to make sure best oxygen product.
19. A control box making certain the total cycle of combustion.
20. An Air contamination control device connected to the flue smokeshaft must be connected to quit.
unneeded retreat of impurities

21. Fan:.
* Electro-ventilator dispersing the second air, the policy of the air flow being implemented by valves along with following the control of the automatic cycle.
22. Controls and additionally regulations:.
Control box watertight to dust, consisting of:

* A button circuit breaker for each engine (ventilators along with heaters).
* A timer with adaptable temporization for the standard of each burner.
* A regulative authority with look for the temperature level of burning.
* A governing authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing should be performed in all-time low of the combustion chamber or the deashing should be Automatic or hand-operated set de ashing.
22. Fine-tune Filtering system: Scruber to be mentionned as optional.
23. Release Needs Conformity: BS 3316 or équivalent standard.
23. Capacity to deal with Plastic: Very little less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997

23. The company should give batches of added components of very initial seriousness in addition to consumable of the burner.
24. The mounted incinerator needs to bear a one year guarantee.
25. The supplier will certainly execute an onsite installation of the burner.
25. The technical training of chauffeurs will certainly need to be provided as well as additionally provided by a service technician from the production facility; it will absolutely consist of medical as well as additionally preventive maintenance, as well as additionally utilizing manufacturer, etc

NB.: Civil jobs as well as likewise any kind of various other connected solutions for the configuration and likewise training of operators need to be consisted of in the heater s expense.


BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FEET CONTAINER


BIOHAZARD DISPOSAL: CONTAINER

GENERAL INCINERATOR, SUITABLE FOR INCINERATION OF VARIOUS KINDS OF WASTE, ABSOLUTELY CONTAINERISED IN A 20 FT CONTAINER, TO CONSIST OF BUILT-IN FUEL CONTAINER As Well As GENERATOR.

TECHNICAL SPECS: SHEDDING CHAMBER AMOUNT (M3); 0.54 m3. SUGGESTED SET SIZE: 60 KG, BURN COST: 69 KG PER HR, STANDARD GAS USAGE 13 KG PER HR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS, WITH TEMPERATURE LEVEL. MONITORING, STANDARD ASH DEPOSIT: 3%, THERMOSTATIC TOOL: YES,
DIMENSIONS: OUTSIDE LENGTH (mm): 1520MM, EXTERNAL SIZE (mm): 920MM, EXTERNAL HEIGHT (mm): 4020 MM
1. Burner for Bio-Medical Waste incineration needed
2. 50 kg/hr
3. 2 chambers have to exist
4. temperature degree of main chamber ought to be 850 levels Celsius
temperature level of added chamber must be 1200 levels Celsius


install a diesel discharged heater


blaze primarily drugs (all type of dosage kinds … … … … syrups, tablet computers, injectables) clinical consummabables, in addition to also biological liquids ……… ….
Capacity around 10 kg/ hr. set up a diesel discharged burner that can fit a collection tons of about 100 kg with an everyday burning requirement of approximately 500kg per 8 hour day. Industrial Burner to harm.
the drugs waste like Alu, PVC, PVDC etc.Installation for burning of pet dog waste cost, existence, settlement terms where it is feasible to acquire in Russia? I am aiming to for ability in between 200 -400 kg.
1.2 AREA PAINT.
Perform painting needed for area not or else specified, and also surface paint of things just keyed at the factory

1.3 LOCATION TRAINING.
a. Submit [6] complete duplicates of operating guidelines laying out the detailed procedures needed for system start-up, operation and also closure. Consist of in guidelines the supplier’s name, version number, service guidebook, parts noting, as well as quick recap of all tools in addition to their typical operating attributes. As well as additionally [Six] complete duplicates of maintenance instructions giving regular maintenance therapies, feasible break downs and additionally fix solutions, repairing guides, in addition to streamlined schematic representations for the system as set up.

3.6. Effectiveness.
Preheat the incinerator for 4 hrs to get to the shooting temperature of 982degrees C [1800] degrees F. Weigh and also tape the general fee weight. Charge the burner at the rated burning capability in kg extra pounds per hour for a period of [4] hrs in addition to run according to the manufacturer’s written guidelines. Contain in performance testing the treatment of the mechanical billing facilities, the burner, the air contamination control tools, the ash.
Carry out testing complete scale for a full- procedure cycle, and likewise keep an eye on performance to validate compliance with the arrangement requires send a record on security outcomes. After the burner has really cooled down, think about the residue. The weight of the deposit will not go past 5.0 percent combustible product of the total charge weight.
After clean-out, the burner will let down any kind of type of evidence of wear and tear, such as shagged or spilling refractory, bending of components, along with stained outside paint.

– – Control.
Test the incinerator under genuine shooting troubles. Validate with testing that all controls run within the optimum as well as minimum restrictions for temperature or timing. Mimic genuine high-risk issues such as warms as well as likewise fire failure by reducing the configurations for the activation of limitation as well as security controls.

– – Treatment Temperature.
Operate the burner under typical lots troubles for not much less than 6 hours. – – Gas syetem: Double gas( both oil as well as likewise gas)


50 to 60kg/hr as well as 100 to 120kg/hr diesel powered incinerator


50 to 60kg/hr and 100 to 120kg/hr diesel powered heater.1. Capability to Blaze the Adhering To Types of Waste:
Family members waste, glass, steel, lightweight light weight aluminum containers as well as additionally window extrudes, steel containers (shattered), wood, tires, soft goods, plastic containers, stress packs, medical waste along with quarantine waste.
2. Required Blazing Capacity:
Around 4,500 loads every year. The incinerator has to effective in blazing sort of waste discussed or any type of blends thereof at a cost of 3 heaps per hour. If needed, the system will certainly be produced to complete at least five successive days non-stop.
3. Burner Layout Requirements:
The system ought to be straightforward in design and treatment, with marginal digital elements.
The burner as well as linked air pollution control modern-day technology will certainly be:
a.Low being use supporting fuel;
b.Low in electrical power use;
c.Require extremely little pre-processing of Neighborhood strong waste;
d.The air contamination system shall abide by EU Waste Incineration Guideline 2000/76 as well as additionally creates part of the entire incinerator arrangement.
3.1 Particular Information that must be Supplied the Design
3.1.1 Burner Details:
a.Batch Lots Capability;
b.Primary chamber style (thickness, diameter, size, insulation, cellular lining, quantity fireplace area, weight); c. Second chamber design (density, size, size, insulation, cellular lining, volume fireplace location, weight);.
c.Exhaust pile style (thickness, diameter, lining variety of areas, total stack size, elevation over base, weight);.
d.Type as well as variety of supporting gas heating systems;.
e.Fuel demands– – type, quantities;.
f.Electrical power use;.
g.Electrical solutions called for;.
h.Water demands– – quantities;.
i.Any various other input needs and also consumables;.
j.Temperatures to be achieved to make certain suitable destruction of waste and also follow called for air contamination control needs (EU Waste Incineration Guideline 2000/76);.
k.Residence time to assure optimal destruction of waste as well as follow needed air pollution control criteria;.
l.Potential weight decrease (percent) of waste;.
m.Options to immediately and also constantly display as well as document info such as days, time of day, set sequential number;.
n.A temperature or aesthetic sign to reveal heat status of equipment; as well as likewise.
o.Details on visuals screens in addition to/ or computer system taping gizmos.

3.1.2 Air Contamination Control System Information.
a.The type of air contamination control devices selected will certainly comply with EU WID Waste Incineration.
b.Directive 2000/76;.
c.Details on the gas cleansing systems to enhance the removal of excellent little bits, acid gases and likewise substantial.
d.metals;.
e.Details on aspects, such as:.
quencher;.
condenser/ absorber;.
venturi scrubber;.
entrainment separator and also.
discharges stack( s).
Electric power usage;.
f.Any different other input needs in addition to consumables (e.g. lime);.
g.Details on graphic display screens along with/ or computer system recording devices;.
h.Environmental requirements – – – – The system would absolutely have the capacity/ capability to follow essential air top quality standards; i.e.EU Waste Incineration Policy 2000/76. (or comparable standards as well as requirements acceptable to the Australian Commonwealth Federal Government Division of the Setup);.
i.Specify air contamination criteria that are kept an eye on.
3.1.3 Site Demands for the Burner.
a.Total land area dimentions;.
b.Infrastructure required (supply of water, power supply water drainage); and also.
c.Any particular eco-friendly or climatic/meteorological aspects that calls for consideration.
3.1.4 Housing Needs as well as also Style.
a.Details on demands for a safeguarded unit for the burner and also connected air contamination control system. The space will absolutely be made to obtain job-related health and safety demands such as: a. Free space is conveniently offered on all sides as well as warm radiation is maintained a minimal offering the operators an:.
b.easy convenient environment as well as also air flow;.
c.There are secure storage area facilities for waste;.
d.There are measures to remain clear of vermin along with bugs;.
e.The products will be of sufficient architectural thickness for safety and to stand up versus sea rust.
4. Training, Upkeep As Well As Instructions Manuals.
4.1 Upkeep Handbooks.
Supply information on maintenance demands, such as:.
a.General cleaning in addition to upkeep– – consistency, abilities/ technological experience needed;.
b.Expected lifetime of elements as well as the system as a whole;.
c.Expected consistency of the demand for replacement of components;.
d.Availability of parts as well as place of suppliers;.
e.Frequency of need for substantial overhauls; and additionally.
f.Estimated down time needed for general maintenance as well as significant overhauls.a burner for our dead pets in the cattle ranch particularly fowl.


For incineration, fundamental and likewise pathological burners


Main unit
Application    For incineration, general and pathological
Capacity      50 – 60 kg/h burn rate
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
Operating time                   Minimum 8 hours daily
Operating temperature        From 850 0C to 1200 0C, Automatic controlled
Residual Ash                       5 to 10%
3.2     Primary Chamber
Construction    Constructed from heavy duty mild or aluminized  steel Or
equal and approved equivalent
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
Internal Construction           Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
Door Lock                             Automatic, Electric type
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
Gratings      Provided
Loading    Manual loading of waste
Primary Burner                           Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted
Blower    Provided. For supplying excess combustion air through the distribution system with speed control system
Temperature    Minimum exit 850 0C
Observation port    To be provided with protective glass type
3.3       Secondary chamber
Construction      Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
Insulation    Refractory material lining
Combustion Temperatures           Above 850 0C, controlled electronically
Gas residue or retention Time          > 2 second at minimum 850 0C
Secondary Burner                       Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                  Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                  Flange mounted
Ejector    Provided, Venturi type, for cooling the flue gases
Combustion Air Fan    Provided for supplying combustion and creating a negative drift and turbulences
Temperature    Maximum  1600 0C
3.4       Chimney
Construction      Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent                                                                 Refractory material lining
Length    10 m above ground
Bore    about 350mm diameter
Discharge temperatures             About 850 0C
Emissions      To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
Control unit                                    Fully automatic with microprocessor based control                                                                      unit (PLC) automating all operations of the                                                                      incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and secondary chambers, turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
Isolator switch                                  Supply and install isolator switch 240V, 100A for the                                                                    incinerator unit, including all necessary cables 10m
Distribution Board    Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
Wiring    Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                       Working length 20m.  Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
Fuel System                                       Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Fuel Tank                                            Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type    Diesel
Fuel Lines                                           Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m
Fuel pipe material; Special copper pipes or similar                                                                        and approved materials
4             Physical characteristics
Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions      About 1.2 x 2.2m (WxD)
5  Operating environment
Power Requirements                       240V,A/C 50Hz, single phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6. Accessories
Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
Spare parts
Burner    1 set
Fuel Filters                                         6 sets
All other spare parts                   required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
Manufacturing standards               NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards
or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
Available    Should be available locally
Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
KEMSA    For inspection and verification
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
Installation and testing    Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
Training
User training                                           On site user training on operation and daily up keep
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
Technical Documentations
User manuals                                          2 sets
Service manuals                                     2 sets
Drawings    2 sets
15        Commissioning
Testing and Commissioning of the machine to the satisfaction of the user
Warranty
Equipment      Minimum of one year after commissioning on all parts.
Equipment system                                     Nil
17.    Maintenance contract
Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning