tiny range incinerator

Incinerators Organic waste disposal system (incinerator)

Burner must satisfy the adhering to specifications:

— Combustion capacity( kW )= 581+/ -10 %

— Combustion capacity( kcal/h )= 500,000 +/ -10%

— Max. l/h( at approx. 50% water content )= 100+/ -10%

Further specifications will be offered with the query.

The burner will be fully self contained.

The burner plant shall include a control board for its procedure. On the control panel we shall have an aesthetic display screen of the chamber temperatures. This visual screen should manage as well as check the incinerator and also his performance.

Ability of destruction in weight will be 60 Kg/h.

It should have the ability to run not less than 10 hours/day

This incinerator must be able to ruin all combustible wastes produced by medical facilities, personal centers, research laboratories, institutes, and so on.

Style Spec: Kinds A, B, C, D, and also E of clinical waste

“PYROLYTIC” burning, by regulating the gasification of waste.

The incinerator need to stay clear of the release of black smoke and fine dust, during the loadings.

It will be able to decrease the quantity of wastes by 98%.

It will be able to hold discharge in the 2nd burn with gas residence of not less than 2 seconds.

The incineration need to be entirely free from visible smoke as well as offending smells.

1.0 The primary ignition heater shall providing ignition of the waste to 850 ° C and must turn off to conserve gas.

The main combustion chamber will be created from hefty steel plate as well as the system is internally lined with a full layer of hote face refractory as well as high performance insulation.

The Internal size of the Smokeshaft at the very least:? 400 and its elevation: 8 m

The Quantity of the combustion chamber a minimum of: 1.200 L

The Measurement of the door for filling in cm a minimum of: 70 × 70.

Burner procedure ought to be Automatic On/Off Fuel?: diesel

Manufacturer to give necessary details for the very best of the installment

The control board shall have all suitable audible and aesthetic alarms to make sure safe operation.

This burner with” PYROLYTIC “burning need to have: 1.
A burning chamber of waste: oPerfectly tight door for the hands-on loading of waste. The loading should be Manual, Set Load oA heater of lighting which the use is restricted to the ignition of waste. oFrontage of loading with door seals increased on joints, wheel of screw plug, flexible joint, as well as stuffing protecting out of refractory. oThe insulation of the burning chamber need to be composed of refractory bricks, having a high web content of aluminium as well as insulates bricks in order to ensure a minimum temperature outside sheet metal. o Structure of the refractory;

? Refractory concrete:. Density: ≥ 100 mm. Nature: 42 %of Al203? Insulate in fibrous panels: Thickness: ≥ 75 mm Nature: Calcium silicate.? Burner of illumination of waste, with fuel, conventional mono-bloc spreading directing plunging fire, illumination and also safety and security of digital ignition, irreversible ventilation,
electromagnetic sluice gate of regulation and isolating valve.
Plate of combustion in Carborundum, preventing the fixing of glass as well as slags

A chamber of post burning of gases oA heater of burning of gases, oA gadget of injection of air allowing a complete recombustion of gases, oA tool of air inlet of air conditioning of waste gases, oA sheath of discharge of the gases charred. oCarcass in solid
sheet steel with assistance of connection. oComposition of the refractory;? Refractory concrete:? Thickness: ≥ 150 mm? Nature: 65% of Al203? Insulate in fibrous panel:? Density: ≥ 85 mm? Nature: Calcium oBurner with gas, mono-bloc spreading directing kind with straight flame, illumination as well as safety and security of digital ignition, long-term ventilation, electromagnetic sluice entrance of regulation and also separating shutoff.
oA second shot of air to guarantee excellent oxygen material.

A control box guaranteeing the complete cycle of combustion.

Follower: oElectro-ventilator dispersing the second air, the regulation of the air circulation being carried out by valves and also adhering to the control of the automated cycle. Controls and also guidelines: Control box watertight to dust, consisting of:

A button circuit breaker for every engine (ventilators as well as burners). A timer with flexible temporization for the guideline of each burner. A regulator with watch for the temperature level of burning. A regulatory authority with digital watching for the temperature of message burning. Electric box

The secondary
burning chamber should damage the pollutant item and must resist to high temperature( 1100 ° C)

Refine Filtering system: Scruber to be mentionned as optional

medical incinerators

● Able to shed 25-30kg per hour
● Consist of 2 chambers to make certain substantial decrease in exhaust
● Be capable of temperature level in range of 800c to 1000c
● Low upkeep style
● Has to be Gasoline
● Required greater than 15amp 220- 250V power
● kW Consumption power usage to be specified
● Onboard or built-in gas storage space storage tank & & should make use of no greater than 12L of passes away el per hr to shed 25-30kg of waste
● Strong waste decrease in variety of 90-97% (ought to be regularly attained).
· General wastes created on a daily basis include paper, plastic, natural products, boxes, plastic containers, leaves, etc;

· Total waste created each day: 10-12 tonnes;

· Hours of Operation: 10 hrs a day;

· Fuel requirement: Diesel or waste oil chosen yet LP gas will be thought about;.
Gas choices Oil.
Gas usage (diesel) 10 litre/hour.
Typical Capability 900kg.
Diamention: Size (mm).
Size (mm).
Elevation Excl. Flue (mm).
Door Opening (mm) 2570.
1120.
1340.
1000 × 1670.
Interior Chamber Dimen:.
Size (mm).
Size (mm).
Elevation Incl Flue (mm).
2200.
790.
790.
Operation:.
Minutes. Operation Temprature.
Max. Procedure Temprature.
House Time in Second Chamber.
Temprature Tracking.
950.
1320

2 sec.
OF COURSE.
Secret Features.
– Auto ignition.
– Automatic control and temprature.
– Upto 250 kg per hr.
– Thick refratory lining rated to 1600 deg C in main chamber retain warmth, increase efficiency.
– Warm immune 5 mm steel.
– Stainless-steel stack.
-12 cm of refractory cellular lining- steel reinforced.
-12 month or 1000 hours waranty.
– Warm recovery system.
– Wide door for ash removal.
– Huge leading opening lid for simple filling

laboratory burner

the whole carcass of animals (cattle, horses,
Sheep, pigs, and so on), in addition to naturally hazardous waste
Products in the gas oven.
? Opening up Doors – – the closure and also addiction automatic system,
Which are taken care of from another location by the operator.
? made to work in long mode as well as quick
Activity (Flying Start EP – – i). –? Totally mobile – installed on wheeled chassis.
Also throughout the procedure. Incinerators need to be provided.
As common devices an unique truck

air retention for at the very least 2 secs at a temperature of less than 850C, the combustion.
In order to achieve the appropriate impact.
? should be a two-chamber burners, main as well as additional.
Gas ovens.
? The waste items to reduce the preliminary quantity.
Feasible to lessen (about 5% clean and sterile ash.
Form).

Burners should be offered in the fuel tank (diesel ).
? The minimum ability of the pet carcass incinerator.
The devastation of 1000 kg/ hr. Burner capability is calculated.
8MJ/kg- product and also 60 % humidity.
? It has to be feasible to use the burner +40.
C to – – 15 0C research laboratory incinerator.
Temperature as well as 5% – – 95 % – of moisture conditions.
? PLC controller as well as a built-in temperature panelita full.
Automatic control, a control computer system, which is kept.
Info on the variant of temperature level relative to time as well as.
Graphic photos.
? must have gas with automated control and malfunction.
Discovery system.
? the capacity to pre- warm-up, body waste burning on as well as off.
Consistency is independent of the first and secondary chambers.
? guaranteeing the incinerator with electrical energy, it.
Must be installed on the generator.
? tidy the burner ought to be easy tools,.
Without utilizing any type of additional tools

medical incinerator producer

1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via a separate forced draft fan bookkeeping for the air supplied with burners. Provision shall be made in the main chamber to gauge the water column pressure.
2. Ability: as much as 4000kg burn not less than 500 kg/ hr.
3. clinical incinerator manufacturer The refractory lining of the chamber shall be strong sufficient to maintain minimal temperature of 1000dc in the primary chamber and also 1200 dc in the secondary chamber. The refractory& & insulation blocks shall have minimum 115mm density each & & conform to IS:8 -1983 & & IS:2042 -1972 respectively.
4. The incinerator covering will be made from SS/MS plate of appropriate thickness (minimum 5mm) as well as painted on the surface with warmth resistant aluminium paint appropriate to hold up against temp.of 250 dc with correct surface preparation. Refractory lining of the warm duct will be done with refractory castable (minimal 45mm thick)& & insulation castable( minimal 80mm thick). Ceramic woollen will be used at warm duct flanges & & development joints.
5. There will be a separate burner each for the key & & second chamber. The warm input capacity of each burner shall suffice to increase the temp.in the main & & secondary chambers as 800+/- 50dc and 1050+/ -50 dc specifically within optimum of 60 mins prior to lose billing. The heaters shall have automatic changing off/on control to stay clear of the fluctuations of temperature levels beyond the called for temp.range.
6. Incinerator shall have visuals or computer system recording tool which shall instantly and also continuously screen as well as document dates, time of day, set consecutive number, Carbon monoxide, Co2, O2 in gaseous exhaust will also be gauged daily.
7. Architectural layout of the chimney/stack shall be based on IS:6533 -1989. The chimney/stack shall be lined from inside with minimum of 3mm thick all-natural tough rubber ideal for the task problems and also shall additionally conform to IS:4682 part I-1968 to prevent deterioration to oxygen and also acids in the flue gas.

8. The incinerator must have an emergency situation air vent. The emergency vent will continue to be closed ie. it shall not emit flue gaseous during normal procedure of the incinerator.

9. Steel gas storage tank from black steel (capability not less than 2500 litres) and also will be set up at the incinerator Space. The container will be supplied with all needed installations consisting of fill, vent, drain as well as overflow line, level sign and also access for examination and also maintenance. Degree switches over will be provided for the complying with solutions.

(a) Reduced level alarm system.
( b) High degree alarm system.
( c) Reduced degree beginning of transfer pump.
( d) High degree stop of transfer pump

10. An all set built produced space shall be supplied for real estate the incinerator. The area will certainly be created in such a way that vacuum is offered on all sides and warmth radiation maintained minimum as well as offering the operators a simple convenient environment as well as ventilation. The materials will be sufficient structural thickness of moderate steel angles neatly covered with metal primer and epoxy repaint to hold up against sea corrosion.
– – effectiveness for the therapy of placenta? and ended or spoiled medicines, cytotoxic and also cytostatic medications recommended: narcotics eg.
– – Does it allow to deal with drug or waste consisting of glass (whatever color: clear or colored white) without triggering surges?
– – The capacity of the liquid waste treatment (blood, urine discolored, other body fluids contaminated, no matter what quantity product packaging?
– – The efficiency of process chemicals (after neutralization and also cleansing: solids and also liquids).
– – Exists microbiological testing especially: the processing efficiency bascillus

burner producers

1. SCOPE OF FUNCTION The work specified in the contract will certainly include.
1. Supply, mount as well as appoint a burner as given in the technical specs
2. Stipulation for adherence to OSHA as well as other statutory requirement relating to Health and Safety of employees during implementation of the works covered in this tender.
3. Analysis and prep work and building and construction of a conventional burner lost with one waste storage room (see the layout)

4. Stipulation of procedure and upkeep manuals and drawings total with upkeep timetable and guidelines.

5. Gas oil storage tank- Light steel1500 litres capability

6. Onsite training for operation as well as maintenance team.

CRUCIAL
incinerator producers To enable the Employer undertake definitive assessment of the tender, tenderers are requested to send with their deals the thorough specifications, illustrations and catalogues with commissioning and maintenance instructions for the Burner they intend to supply, set up and commission. Tenderers that fail to comply with this need fully will have their tenders denied. 2. TECHNOLOGICAL REQUIREMENTS OF THE REQUIRED INCINERATOR

2.1 General Summary

The plant must have four distinct sections that show 3 concepts of turbulence, house time and also temperature level retention. The managed areas may consist of however not limited to:
1. Total plant format
2. Feed chamber/charging
3. Key combustion chamber
4. Particle scrubbers
5. Acid gas scrubbers.
6. The stack/chimney.
7. Minimum capability of key chamber = 0.18 cubic metres
8. Shed rate (rate of waste incineration) = a least 20 kg per hr
9. Ought to have a complete size counterbalance loading door allowing very easy access to the primary chamber for loading as well as removing ash.
Supply, Setup and also Appointing of An Incinerator in Eastern Hydros [Page 28

2.2 Feeding and also Charging
Regulated hygienic mechanical feeding that does not adversely influence the air temperature level in the key and also second chambers of the burner shall be utilized.
2.3 Main Burning Chamber.

a) This chamber need to be equipped with burners that make use of low sulphur gas.
b) The chamber should guarantee a minimal leave temperature level of 850 levels centigrade.

2.4 Secondary Burning Chamber (After burner)

a) Should be fitted with heaters that utilize low sulphur gas.
b) Guarantee second air supply is controlled.
c) Make sure house time is not less than two seconds.
d) Guarantee that the gas temperature as gauged versus the within wall in the additional chamber and not in the flame area is not less than 1100 levels centigrade.
e) Make sure the discharged oxygen web content of the emitted gases is not less than 11%.
f) Guarantee both main as well as second combustion temperature levels are preserved up until all waste is completely ignited.

2.5 Particulate Removers

A mechanical particle enthusiast have to be incorporated after second burning chamber for removal of particulate toxins entrained in the flue gas stream. The particulate collectors may consist of any of the complying with or a mix thereof:.
a) Cyclone separator.
b) Electrostatic precipitators.
c) Textile filters.
2.6 Chimney/Stack

l) The chimney should have a minimal elevation of 10 metres above ground level as well as clear the acme of the structure by not less than 3 metres for all roofs. The topography as well as elevation of adjacent structures within 50 metres radius must be taken into consideration.
m) The smokeshaft ought to be visible to the driver from the feeding location.
n) The minimum leave rate need to be 10 metres per second as well as at the very least twice the surrounding wind speed (Efflux speed = wind speed x 2) whichever is higher to make certain no down cleaning of leaving gases.
o) The point for dimension of discharges will be offered.

2.7 Instrumentation

a) Instrument for figuring out the inside wall temperature and also not burner fire temperature must be attended to both key and also secondary chambers.
b) A distinct and also visible alarm need to be mounted to alert the operator when the second chamber temperature level goes down to listed below the called for temperature.
c) A carbon monoxide gas and also oxygen meter/recorder should be offered

d) A smoke thickness meter/recorder need to be provided.
e) A strong particulate meter/recorder ought to be provided.
f) Any kind of various other instrument that might be taken into consideration essential.

2.9 Exhaust Purview

a) Combustion performance (C.E) shall go to the very least 99.00% where C.E = %Co2 x 100/ [% Co2 + carbon monoxide gas] b) The temperature level of the primary chamber will be 800 +/- 50 degrees centigrade.
c) The secondary chamber gas home time shall go to least 1 2nd at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack gas.
d) Opacity of the smoke need to not surpass 20% seen from 50 metres with naked eyes.
e) All the discharge to the air apart from vapor or water vapour should be odorless and without mist, fume and beads.
f) A 99.99% destruction and elimination performance (DRE) for every primary natural dangerous component (POHC) in the waste feed where DRE [( Success – – Wout )/ Win] x 100 where Success = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack before the release to the atmosphere.
g) The average dioxin and also furan concentration in the exhaust must not go beyond 80mg/m3 total dioxins and furans if gauged for a duration of 6 to 16 hrs.

– – Guidebook technological monitoring is shipped with the equipment with all explanations of failings as well as resolutions.
Capacity/island: 4000 kg/day; 25000 kg/day; 31000 kg/day; 48000 kg/day

Burning temperature– over 12000C

Two chambers– minimum

Exhausts– dioxin and also hefty metaly– much better then Kyoto procedure

Emission– monitoring system

Waste unloiding– directly from waste track to incinerator

clinical waste incinerator up for sale

Waste type: healthcare waste
Waste density: 125 to 350Kg/M3
Waste calorific worth: 4000KCAL/kg
Moisture web content: 10– 25%.
Estimated ash deposit: 5– 10%.
Nominal ability: 50kg/hr set load.
Second chamber: 2 [e-mail   shielded] C.
Environmental: NEMA ACT (EMCA) 1999, Waste Monitoring policies, 2006.
Key Burning chamber:.
The main burning chamber is the major framework of the burner, produced from mild steel plate as well as tensed with rolled steel sections.

It is lugged from the flooring degree on a substantial steel support structure. Inside the covering is lined with calcium silicate insulation and also a warm face combination of extremely obligation brickwork or high stamina castable.

The primary burning chamber must make sure minimum departure temperature is not much less than 850? C.
One Hand-operated Lots Burner making up:.
Hand-operated filling door.
Straight solid fireplace, refractory lined primary burning chamber. Approx. measurements 800x2100mm( DxL).
Complete sized bulk load/ash elimination door.
1 off diesel-fired ignition burner– temperature managed.
1 off combustion air supply fan as well as distribution system, automatic control.
High capability secondary burning chamber with house time not much less than 2 seconds @>> 850? C.
1 off diesel-fired afterburner– temperature controlled.
Control panel– automatic procedure.
Temperature indication primary and additional chambers 0-1200? C.
Refractory lined flanged chimney to an elevation of 10M above ground degree.
NB: The additional combustion chamber must ensure that the gas temperature as gauged against the inside wall in the second chamber & & not in the flame area, is not less than 1100? C

Throughput: 50kg/hr at a small calorific value of 4,000 kca/kg as well as a typical mass thickness of 120kg/m3 for basic waste as well as 160kg/m3 for health care waste.
Ash: The waste will be decreased by 90 ~ 95% to leave 10-5% ash.
Quality/Environmental Criteria: NEMA ACT (EMCA) 1999, BS3316.
Operating duration: anticipated daily operating period 8 hours.
Maximum operating duration: 12 hrs.
Chamber: should be refractory lined to the list below requirement;.
Hearth and also reduced section of chamber wall surfaces.
Hot face product:.
Super obligation firebrick.
Restricting constant service restriction 1500? C.
Thickness: 100mm.
Thermal conductivity: 1.3 W/mk.
Insulation:.
Calcium silicate.
Limiting continuous service limit 1000? C.
Thickness: 25mm.
Thermal conductivity: 0.095 W/mk.
Chimney/Stack: Ought to be made from refractory lined moderate steel or excellent quality air-cooled s/s.
The chimney/stack should have a minimum height of 10m over ground degree.
Ignition heaters: fully packaged oil kind, total with electrical ignition as well as fire failure controls, wired with continuous running follower as well as full with all shutoffs, follower as well as motor.
Maximum rating: at least 450kW/hr.
Burner: scheduled on/off operation.
Maximum consumption: at least 6Ltrs/hr.
Average intake: a minimum of 3Ltrs/hr.
Afterburner:.
fully packaged oil kind, total with electric ignition and also fire failing controls, wired with continual running follower and also total with all valves, fan and also motor.
Optimum score: at least 450kW/hr.
Heater: arranged for on/off procedure.
Optimum usage: at the very least 9Ltrs/hr.
Typical usage: at least 4.5 Ltrs/hr.
Flue gas therapy: should have particulate eliminator (scrubbers).
Electric supply: solitary phase: 220/240VAC; 50/60Hz

Paperwork:.
clinical waste burner to buy Procedure guidebook: 2 collections.
Service/maintenance handbook: 2 sets.
Certification: NEMA (or other recognized) qualification.
Capacity to service equipment: the agent/supplier will have sufficient facilities, spare parts, consumables and also qualified competent technological team.
Training: the Agent will carry out a two days burners training after installation and also appointing of the tools.

The Representative will perform a 2 days operation & & maintenance training to the Biomedical engineering employees after installation & & appointing of the equipment.

tiny scale clinical waste burner

Hazardous and also unsafe wastes,
Clinical pharmaceutical as well as friendly liquids Wastes
Domestic trash
Electric and digital wastes
Hazardous waste
In General, all kind of wastes and also garbages
Ability 50-60Kg/ h

Combustion supporting materials
Coal oil, diesel oil

Temperature level inside
800-10000C

1000-12000C

Burning effectiveness
> 98%

Power intake
1.3 KW

Sound
< 78dB

Index of let smoke and waste gas
Ringelman’s smoke index < degree 1

Smoke focus
Oil
45.5

( mg/m3 ).
Gas.
25.5

( mg/m3 )

SO.
Oil.
0.176.
Gas.
0.065

NOX.
Oil.
0.031.
Gas.
0.038

H2S.
Oil.
0.016.
Gas.
0.008

CO
.
Oil. 8.32.
Gas.
35.64

small scale medical waste incinerator Demands.
Incombustible and also eruptive products not admitted

Process way.
2 burning closets (dampness drying, heat dirt elimination)

Combustion/ Heater.
Top quality made in Italy

Blower.
Good Quality made in China

Control Electrical.
Top quality made in China

Ability 50 Kg/h

Functioning Voltage.
220 V

Power.
1000 W

Applied For.
200 beds

Input Fashion.
Hands-on

Medical Burner, 24 kg/hr.
Medical Burner, 24 kg/hr including panel board, controls as well as accessories.
Heater entrance.
Chimney.
Blower.
Combustion heater

Medical Incinerator, 12 kg/hr.
Medical Burner, 12 kg/hr including panel board, controls and also accessories.
Furnace gateway.
Chimney.
Blower.
Burning burner

Medical Incinerator, 6 kg/hr.
Medical Burner, 6 kg/hr consisting of panel board, controls as well as devices.
Heater gate.
Chimney.
Blower.
Burning heater

burner for clinical waste

MINIMUM CRITERIA FOR ENGINE OF INCINERATION
CAPACITY OF INCINERATION 30KG/ H

1. BASIC SPECS:

The incinerator for clinical waste should be assigned for the damage of all kinds of waste generated by the Facility for Wellness (waste type medical facility, facility, medical laboratory for devastating capability of 30kg/ h).

Pyrolytic gasification combustion control shall:

? Prevent development of black smoke and also dust development tine loading of waste;
? Supply normal and complete burning of the waste;
? Provide regulated guaranteeing the absence of shade, cloud of smoke or shedding odor;
? Permit restricted gas intake

The incinerator with pyrolytic combustion must have:

a. Combustor:

– – Chamber solid steel support legs sheet;
– – The cellular lining is made of refractory blocks and also a thermal insulation making certain a minimum temperature of the sheet;
– – The sole burning is made up of a refractory lining particularly created to meet the thermal, mechanical as well as corrosive liquid waste requirements and liquified glass;
– – The dimensions of the floor are geared up laterally primary air nozzles that sustain combustion;
– – The fireplace is outfitted with a mixing system of waste burning is regulated switch;
– – The recovery operation of the ashes will happen once a day line prior to starting the day’s procedure.

Structure of the refractory cellular lining:
* Insulation:
– – Operating temperature level: 1000 ° C max
– – Nature: Calcium Silicate
– – Thickness: 80 mm
* Refractory:
– – Running temperature: 1650 ° C max
– – Nature: Refractory bricks with 42 alumina – Density: 110mm

Heater burning:

– The combustion chamber is geared up with a burner to line to ensure right temperature level for the overall damage of waste combustion; – Automatic monobloc burner and flame dive furnished with a digital ignition system and also permanent air flow. Air fan: – A main air and secondary air follower gives the required oxygen delivery – There is an electric motor operated shutoff that regulates the circulation according to the combustion. – The stress of the follower is 500 mm CE to pierce the mass of
– waste throughout combustion.

b. Article – combustion chamber:

– Deal with the gas has a minimal temperature level of 1100 ° C with a minimal residence time of two secs the afterburner is to; – An additional air injection is anticipated as well as gives best oxygen material; – The heater makes sure a minimum temperature of 1100 ° C constant; – The style of this heater resembles burning burners; – The afterburner is– outfitted with accessibility doors in order to make sure normal cleaning– of dust; – The afterburner is lined with high thermal insulation with a thickness of 150 mm

c. Closet, control and also regulation: – The entire installment will adapt European standards( EU ). – The electrical power is 220V 50Hz solitary phase. – Regulatory authorities of temperature with electronic display screen:.
–? 1 to manage the temperature of the burning chamber.? 1 for regulating the temperature of the afterburner.
? The hands-on controls are provided on each thing
.

2. PRODUCT MEASUREMENTS

Summary Dimensions. Destructive ability 30 Kg/ hr. Procedure 12h/24, 6d/ 7. Gas diesel oil. Smokeshaft Elevation: 5m, Diameter: 280mm.
Quantity of combustion

chamber Burning: 0.3 m3.
Blog post burning: 0.2 m3. Combined burning chamber: 0.3 m3.
‘TEMPERATURE LEVELS:. Combustion. Afterburner. 900 ° C. 1100 ° C. POWER BURNER. Burning. Afterburner

0.11 KW.
0.11 KW0

Follower power 0.37 kW

waste burner manufacturers from china

Incinerate: medical waste and also basic waste Capacity to melt waste:
400-500kg/ hr.
Gas: Diesel.
Gas Intake: 10 liters/hr optimum.
Incineration temperature: 950-1300 degrees centigrade.
Case: thick (minutes 5mm) stainless steel covering as well as totally protected to.
hold up against sea humidity Voltage 220/240v or 380/415V Regularity 50Hz.
high-capacity, powerful, European Criterion burner, perfect for high volume incineration, with integral after-burner for greater performance as well as exhausts manage.
Waste Type as well as Melt Rate.
Made particularly for usage by fowl farmers,.
lamb farm owners, abbatoirs as well as for pet.
cremation. The burner will shed up to 50kg of.
waste per hour (as much as 150kg shed.
Construction.
Mild steel welded construction containing sheet steel.
as well as structural area supports.
Cellular lining.
Monolithic high quality refractory concrete with high grade insulation backing.
Heaters.
Totally automatic, high-efficiency burners with digital ignition, flame acknowledgment as well as combustion control gadgets fitted.
Loading– Ash removal.
Hands-on ash elimination from the key chamber. (Ash doors are readily available on demand).
Outside coating.
Multi-coat premium quality, high-temperature aluminium enamel leading coat paint, completed in silver.
Control.
Fully automatic sequential control given by interior.
waste burner producers from china, PLC system providing control of:.
1. Additional chamber pre-heat.
2. Shed cycle (variable).
3. Cool cycle.
Fuel Options.
Diesel, LPG, Natural or Bio Gas.
Normal Fuel Consumption.
Diesel: 8/ 10 litres per hr.
Fluid Propane Gas: 6/ 8 litres per hour.
Gas: 7/ 9 Nm3 per hour.
Electrical supply.
240volt 16 amp.
Secret Specifications.
Chamber Quantity 2.38 m3:.
2.2 m (l) x 0.9 m( w) x 1.2 m( h).
Lots Capacity approximately 1000kg.
Tons Approach Top. · Kind: Pyrolytic

· Use: For medicines

· With Chassis to be Placed in truck/lorry

· May have a main as well as additional combustion chamber

· Should have a dilution chamber

· Capability: 100 Kgs per hour

· Source Of Power: Diesel or Natural Gas or Liquified Gas

clinical waste diesel incinerator

medical waste diesel burner Burning Price:47.5–– 50kg/hour.
Minimum Operating Temperature:850 o C( key combustion).
Optimum Operating Temperature level:1450 oC( Afterburner chamber).
Secondary Burning Capacity: Compulsory.
Thickness Insulation:20 mm High.
Refractory Casting: Minimum 65mm.
Heavy duty refracting lining to withstand:1500 oC.
Typical burn out time: maximum:3 humans resources.
Fuel type: Diesel.
Gas Consumption in L/hr:7.5 to 9.
Home time in additional chamber:2 sec.
Residue ash blog post 100kg: Max 3.8 kg.
Gadget for protecting against transmittable spatter and/or cross-contamination by securely sanitizing needles, rings, and so on by infrared warmth.
Electric characteristics.
1) A 120V, 60Hz mono-phase electrical source with line connection plug NEMA 5-15 kind.
2) Protections against over-voltage and over-current line conditions.
3) Compliance with applicable Haitian standards as well as regulations.

Operational qualities.
4) Rapid full sterilization in around 5-7 s.
5) Totally isolated quartz/ceramic tube, to provide security for the individual (no open flame).
6) Functioning temperature level around 820 ° C.
7) Mounted on a steady base, as per instance below.