Technical specification for burning machine,animal waste incinerator manufacturer
1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by custom authority to burn different kinds of drugs. All need equipment must be provided.
2.Warrantee: booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare parts, preventative maintenance repair and corrective maintenance must be included in the cost and provided to the customer.
3.All needed electric and water connections must be provided.
4.Both systems must be of high quality and must be environmental friendly.
5.The capacity of each system should be up to 100 kg/hr.
6.The system must have automatic feeding.
7.Each system must consists of two burning rooms, one primary room for burning the drug and another room for burning the gases that emit as a result of primary burning.
8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm.
9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for burning organic materials.
10.Waste products should not exceed 5%.
11.System must have automatic ignition system.
12.System should use diesel (HSD) as fuel and should not consume more than 8 to 10 lt/hr .
13.Each system should be provided with fuel tank of size adequate to operate the system for one full day.
14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050 C ± 50 C. the system should be capable of continues operation and should be provided with cement layer insulator with adequate thickness.
15.Oven should be provided with heat insulator to allow easy operation.
16.Gas should remain in the secondary room for not more than 1.5 second.
17.The primary burning room should have at least 2 burners.
18.The secondary burning room should have one burner.
19. Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for maintenance.
20.Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank should have capacity of 1000 lt and should be fixed to the system and provided with water level indicator.
21.Each system should have special technology for separating waist products and humidity after gas processing.
22.Each system should have cooling capability after operation.
23.Each system m should be provided with exhaust pipe with 250 mm diameter and 10 m high. The base of the exhaust system should be 1000 mm. The exhaust pipe should be 6 mm and should be provide with heat insulator. The exhaust system should be provided with pressure indicator. It should also provide with ladder and Lightning Arrestor.
24.Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP.
25.Each system should be provided with control panel and indicators and needed safety equipment and alarm systems. The control panel should show at least temperature in both the primary and secondary rooms and injectors of the filters and load.
26.Each system should be provided with alarm system for any breakdown or defect of any component of the system.
27.The following personal protective tools must be provide:
a.Heat resistant garments for 20 persons.
b.Heat resistant goggles for 20 persons.
28.All components of each system should be painted with silver color that is heat resistant.
Dec, 2023
scientific waste incinerator china
medical waste incinerator china, Design, supply and manufacture ex works of one Surefire Manual Load TS50/1 Medical/General waste incinerator as detailed below: –
· Waste type: Mixed type o,1,2,3,&4 hospital/clinical bio hazard waste
· Waste density: 125 to 350Kg/M3
· Waste CV: 4000 KCAL/kg
· Moisture content: 10-25%
· Estimated ash residue: 5-10%
· Nominal capacity: 30Kg/hour batch load
· Secondary chamber: 0.5 second @ 850oC
· Compact laboratory style
· Two combustion chambers
· Ecologically friendly
· Up to 50kg of waste / hour
· To be used for animals
Dec, 2023
chinese burner providers
In a simple design with a metal steel drum electric. including:
A cage for receipt of biomedical waste;
A combustion chamber with fireplace with a filter to retain ashes;
A cover;
An air supply;
A turbine allowing the supply of the air.
Combustion temperature: 1800 ° C. Compliance with European standards.
Comes with all necessary accessories
Supply of incinerator model PDR-18 with:
· Capacity 100 kg/hr of waste containing up to 85% moisture
? Two combustion chambers
· Two fully automatic, oil fired, pressure jet burners
· Panel board
· Diesel tank of capacity 250 It. with 2 diesel pipelines, filter and valve.
Type: for animals waste
Capacity: 30 kg per hours for a maximum load of 120 kg.
GLP Gas
Voltage: 110V-120V
Semiautomatic control board
Stainless steel chimney, 3.5 meters above the incinerator.
High temperature painting for all the incinerator.
Front door for loading and unloading.
Fuel Diesel Oil 8/ kerosene
Capacity (m3) 0.57
Ave Capacity 50 kg per hour
Ave time for Burnout 5 hrs
External Dimensions
Length 2000mm
Width 1100mm
Height including flue 3500mm
Door opening
Internal Dimensions
(primary chamber)
Length 1200mm
Width 620mm
Height 660mm
Operation
Min. operating temperature 9500C
Max. operating temperature 13200C
Residency time in second chamber 2.0 seconds
Weight 1850kgs
Ancillaries
Operating and maintenance manuals
Recommended Spare list
300 liter fuel tank
Plant burning rate – 100kg/hr
Fuel – Diesel oil – 35 sec Redwood
Overall dimensions are as follows:
Width 2261mm
Length 3264mm
Chimney Diameter – 390mm
Chimney Height – 8000mm
chinese incinerator manufacturers, We process 8-10 ton waste of sheep carcass and its byproduct per day. We are looking for the equipment: combustion burners(combined fuel supply:natural gas and diesel),control panel and filter system. The diameter of the incinerator is 20 cm. Lower calorific power of the waste is 4KW/KG. Heating power 4000KW
Dec, 2023
university hospital incinerator manufacturers
The Incinerator Plant is outcome wastes incineration from Different petrochemical devices. In this task we desire to blaze all result wastes from petrochemical gadgets and also additionally produced high stress steam from heater plant heat produced.
In the starting outcome waste from petrochemical collects as well as also moves to transit as well as additionally setting up center in various types. Input feeds of heater plant are gotten listed below table:
health center incinerator suppliers, Waste streams of petrochemical device gather and additionally keep en path and also Arranging Facility.
En Path as well as Planning Facility one lab demand to be taken into consideration.
In this center, waste will be identified in 2 groups:
–– – –– Improper for burning
– – Wastes that can be gone back to petrochemical.
Appropriate wastes are recognized right into both categories: –– – Input wastes to revolving kiln, consist of solids as well as likewise waste fluids.
–– – – Input wastes to fixed kiln, include clean fluids as well as likewise gasses.
All strong wastes should be moved to storage area pit from Transport along with Sorting. Solid wastes storage space pit is input of rotating kiln.
All liquid wastes require to be maintained and kept in Transit as well as Arranging. All storage space as well as stablizing tools or center have actually to be taken into factor to consider.
Storage and stablizing capacity requirement to be considered based on worst circumstances (shut down).
Normally burner plant contains 2 similar trains (capability of each train is 100%). Each train contains a rotary kiln as well as a dealt with kiln.
Dec, 2023
pet incineration equipment
Minimum capacity: 500L
Provided with supporting structure
valves
Level indicator tank
funnel
Filter impurities in the mouth of the tank
Especifica??es técnicas
Incineradora a Diesel de 25Kg/h
Caixa
Dimens?es da caixa do incinerador.
Largura aprox: 900 mm
Comprimento aprox: 1000 mm
Altura aprox: 1000 mm
Dimens?es da chaminé
Altura min: 6000 mm
Diametro: 300 mm
Provido de duas camaras primarias e secundaria.
Volume da camara primaria: 0.25 m3
Volume da camara secundaria: 0.25 m3
Construído em a?o com revestimento refractário
Porta de remo??o de cinzas
Visor de chama nas duas camaras
Sondas de temperatura do tipo PTC
Queimadores
Potencia Térmica Max: 5100 Kcal/h, 59 Kw
Min 1700 Kcal/h, 20kw
Consumo aprox. 2.6 a 5.0 Kg/h
Tens?o -230V 50Hz
Ventilador 75W, Rotacao 2800 Rpm
Transformador de igni??o
Igni??o por meio eléctrodos
Controlador de queimador
Quadro controlador
Termómetro digital de camara primaria e secundaria
Regula??o de cabe?a de combust?o
Regula??o de ar
Combustível: Diesel
Dec, 2023
clinical waste heaters providers
chemical reps to be utilized:
10% heptyl (unsymmetrical dimethylhydrazine) water solution,
heptyl (unsymmetrical dimethylhydrazine) vapour with 0.8 to 1.0 kg/m3 concentration,
10% azotic (nitric) acid water treatment,
azotic (nitric) acid vapour with emphasis as much as 1.1 kg/m3;
2. neutralization approach: thermal degeneration;
C to +1200? C;
5. inlet stress and anxiety: as high as 2 bars;
6. automated control system;
7. total dimensions shall enable positioning the device on a cars and truck structure.
clinical waste heaters producers General Specs
6mm plate steel sheel building
11cm 1400 o C Refractory L iner
Temperature controlled Heaters
Added combustion Heating systems
Interlock Turn On Load Doors
Separate Ash Door
One 2nd second Home @ 1000 o C.
400 ° C Silicone Based Paint Full.
Alloy Temperature Noticing System.
Manufacturing facility wired as well as checked out.
Capacity-20 kg/ human resources.
Primary Chamber-1607 L.
Hearth Area-1:36 sq. m.
Secondly Chamber-694 L.
Main Heater (oil) -420,000 btu.
Second Heating system (oil) -900,000 btu.
secondary Combustion-1/ 6 hp.
Exhaust Stack-46cm x 6m.
Electrical Service-220/ 50.
Weight System-5.700 kg.
Dimension “D” -152 centimeters.
Tons Port Elevation- 60x 60 centimeters.
Ash Port Altitude -36 x 36 cm
Dec, 2023
portable incinerator manufacturers
Tanque
Capacidade mínima: 500L
Provido de estrutura de suporte
Válvulas
Indicador de nível de tanque
Funil
Filtro de impurezas na boca do tanque
comprising of, as a minimum, electronic ignition and all necessary interlocks and safety devices to provide safe
operation. The chamber and burner shall be designed to maintain a minimum combustion temperature of at least
930 to 980 C (1700 to 1800 F), but shall not to exceed 1150 C (2100 F). The ash-removal system shall consist of, as
a minimum, the direct manual removal into a dry
Cyclone air filters shall be provided to remove the larger particulates. Cyclone air separators may be provided with
powered fans to increase the velocity of the gases inside the cyclone to improve the collection efficiency for smaller
particles.
5.16.2 MEDICAL WASTE INCINERATORS
Medical waste incinerators shall be specifically designed by the manufacturer to dispose of all medical wastes. All
units shall be designed for 8 hours
per day of continuous operation and be rated in quantity per hour (i.e. kg/hr or lbs/hr).
Incinerator loading or charging of medical waste shall be batched-fed manually.
Primary combustion chamber shall be the stationary fixed-hearth (or kiln), multiple-chamber, retort type or larger
capacity rotary-hearth (or kiln) type. Burner and combustion air controls shall be fully automatic comprising of, as a
minimum, electronic ignition and all necessary interlocks and safety devices to provide safe operation. The
Dec, 2023
medical waste incinerator china
medical waste incinerator china, Design, supply and manufacture ex works of one Surefire Manual Load TS50/1 Medical/General waste incinerator as detailed below: –
· Waste type: Mixed type o,1,2,3,&4 hospital/clinical bio hazard waste
· Waste density: 125 to 350Kg/M3
· Waste CV: 4000 KCAL/kg
· Moisture content: 10-25%
· Estimated ash residue: 5-10%
· Nominal capacity: 30Kg/hour batch load
· Secondary chamber: 0.5 second @ 850oC
· Compact laboratory style
· Two combustion chambers
· Ecologically friendly
· Up to 50kg of waste / hour
· To be used for animals
Dec, 2023
incinerators for sale
chamber and burner shall be designed to maintain a minimum combustion temperature of at least 760 to 870 C
(1400 to 1600 F). The ash-removal system shall consist of the automatic continuous removal of the ash into an ashquench
pit where cooled by water and removed by conveyor.
Secondary combustion chamber shall be a solid-walled and -floored, horizontal, refractory-lined cylinder type
incinerator designed to oxidize (or burn) the organic vapors and gases. Burner and combustion air controls shall be
fully automatic comprising of, as a minimum, electronic ignition and all necessary interlocks and safety devices to
provide safe operation. The chamber and burner shall be designed to maintain a minimum combustion temperature
of at least 930 to 1200 C (1700 to 2200 F) with a minimum gas residence (or dwell) time of 2.0 seconds. The ashremoval
system shall consist of, as a minimum, the direct manual removal into a dry collection hopper.
Cyclone air filters shall be provided to remove the larger particulates. Cyclone air separators may be provided with
powered fans to increase the velocity of the gases inside the cyclone to improve the collection efficiency for smaller
particles.
Dec, 2023
chinese incinerator manufacturers
In a simple design with a metal steel drum electric. including:
A cage for receipt of biomedical waste;
A combustion chamber with fireplace with a filter to retain ashes;
A cover;
An air supply;
A turbine allowing the supply of the air.
Combustion temperature: 1800 ° C. Compliance with European standards.
Comes with all necessary accessories
Supply of incinerator model PDR-18 with:
· Capacity 100 kg/hr of waste containing up to 85% moisture
? Two combustion chambers
· Two fully automatic, oil fired, pressure jet burners
· Panel board
· Diesel tank of capacity 250 It. with 2 diesel pipelines, filter and valve.
Type: for animals waste
Capacity: 30 kg per hours for a maximum load of 120 kg.
GLP Gas
Voltage: 110V-120V
Semiautomatic control board
Stainless steel chimney, 3.5 meters above the incinerator.
High temperature painting for all the incinerator.
Front door for loading and unloading.
Fuel Diesel Oil 8/ kerosene
Capacity (m3) 0.57
Ave Capacity 50 kg per hour
Ave time for Burnout 5 hrs
External Dimensions
Length 2000mm
Width 1100mm
Height including flue 3500mm
Door opening
Internal Dimensions
(primary chamber)
Length 1200mm
Width 620mm
Height 660mm
Operation
Min. operating temperature 9500C
Max. operating temperature 13200C
Residency time in second chamber 2.0 seconds
Weight 1850kgs
Ancillaries
Operating and maintenance manuals
Recommended Spare list
300 liter fuel tank
Plant burning rate – 100kg/hr
Fuel – Diesel oil – 35 sec Redwood
Overall dimensions are as follows:
Width 2261mm
Length 3264mm
Chimney Diameter – 390mm
Chimney Height – 8000mm
chinese incinerator manufacturers, We process 8-10 ton waste of sheep carcass and its byproduct per day. We are looking for the equipment: combustion burners(combined fuel supply:natural gas and diesel),control panel and filter system. The diameter of the incinerator is 20 cm. Lower calorific power of the waste is 4KW/KG. Heating power 4000KW