waste incinerator


Burring Ability 100/ 200 KG/ human resources Please develop your deal right here
Variety of Heater 02 Nos Please write your bargain here
Burner Kind Dual Chamber
Main Chamber
Secondy Chamber Please compose your deal right here
Burner Layout Controlled Air Please compose your offer listed below
Gas to be taken advantage of Gas/ Deisel Please write your deal right here
Packing System Manual/ Batch Kind Please create your offer below
Warmer Time 20 mins Please produce your bargain listed below
Kind of Paint Heat Resistance enamel paint Please compose your deal listed below.1. Capability: to cremate (carrion and also spoils) 350-400kg/ hr

4. Heater weight: 1800-2000 kg

7.

Type of Paint Warm Resistance enamel paint Please compose your offer below.1. Capacity: to cremate (carrion and likewise spoils) 350-400kg/ hr

4. Heater weight: 1800-2000 kg

7.

6. Burner weight: 1800-2000 kg

7. Quantity: 0.70-0.80 m/cube

8. Outside measurement: 1.4-1.6 * 1.0-1.15 m (L * W)


medical incinerator prices

INCINERATOR WITH CONTROL UNIT

Has been specifically designed for use in:

– Hospitals

– Clinics

– Laboratories

– Disaster relief Operations

– Animal Cremation

– Can be used to eliminate medical waste with reliable, on site

technology

 

An innovative system for medical facilities.  It has been designed to

eliminate hospital waste (including infectious and pathological waste)

efficiently, and with a minimum of expenses.  Existing personnel can

be instructed on the use of this product.medical incinerator prices

 

The operator opens the primary chamber door, places the waste

inside and turns on the unit.  A timed cycle preset by the operator

begins and the waste is reduced to 5% ASH BY VOLUME.

 

– Incinerates up to 8 cubic feet (0.22 cubic meters) per load, which is

normally 330 ibs (150kg) per (8 hour) day.

 

– Designed by specialists in portable systems.

– No on site construction

– Minimal training for operators.

 

 

– Built for safe, easy operation with state-of-the-art controls.

– Dual chamber combustion and high exhaust temperatures, if

required, in excess of 1025◦C.

– Preset cycle time automatically controls start up and shut down

– Thermostatic temperature control insures efficient fuel consumption.

Power requirement: 220 V, 0.35 KW/hr

 

incinerator manufacturers

1. SCOPE OF WORK The work specified in the contract will include.
1. Supply, install and commission an incinerator as provided in the technical specifications
2. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this tender.
3. Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )

4. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and instructions.

5. Fuel oil storage tank- Mild steel1500 liters capacity

6. Onsite training for operation and maintenance staff.

IMPORTANT
incinerator manufacturers To enable the Employer undertake conclusive evaluation of the tender, tenderers are requested to submit with their offers the detailed specifications, drawings and catalogues with commissioning and maintenance instructions for the Incinerator they intend to supply, install and commission. Tenderers who fail to comply with this requirement fully shall have their tenders rejected. 2. TECHNICAL SPECIFICATIONS OF THE REQUIRED INCINERATOR

2.1 General Description

The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:
1. Overall plant layout
2. Feed chamber/charging
3. Primary combustion chamber
4. Particulate scrubbers
5. Acid gas scrubbers.
6. The stack/chimney.
7. Minimum capacity of primary chamber = 0.18 cubic metres
8. Burn rate (rate of waste incineration) = a least 20 kg per hour
9. Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
Supply, Installation and Commissioning of An Incinerator in Eastern Hydros [ Page 28

2.2 Feeding and Charging
Controlled hygienic mechanical feeding that does not negatively influence the air temperature in the primary and secondary chambers of the incinerator shall be used.
2.3 Primary Combustion Chamber.

a) This chamber should be equipped with burners that use low sulphur fuel.
b) The chamber should ensure a minimum exit temperature of 850 degrees centigrade.

2.4 Secondary Combustion Chamber (After burner)

a) Should be fitted with burners that use low sulphur fuel.
b) Ensure secondary air supply is controlled.
c) Ensure residence time is not less than two seconds.
d) Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees centigrade.
e) Ensure the emitted oxygen content of the emitted gases is not less than 11%
f) Ensure both primary and secondary combustion temperatures are maintained until all waste is completely combusted.

2.5 Particulate Removers

A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:
a) Cyclone separator
b) Electrostatic precipitators
c) Fabric filters
2.6 Chimney/Stack

l) The chimney should have a minimum height of 10 metres above ground level and clear the highest point of the building by not less than 3 metres for all roofs. The topography and height of adjacent buildings within 50 metres radius should be taken into account.
m) The chimney should be visible to the operator from the feeding area.
n) The minimum exit velocity should be 10 metres per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases.
o) The point for measurement of emissions shall be provided.

2.7 Instrumentation

a) Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers.
b) An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required temperature.
c) A carbon monoxide and oxygen meter/recorder should be provided

d) A smoke density meter/recorder should be provided.
e) A solid particulate meter/recorder should be provided.
f) Any other instrument that may be considered necessary.

2.9 Emission Limits

a) Combustion efficiency (C.E) shall be at least 99.00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
b) The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
c) The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack gas.
d) Opacity of the smoke must not exceed 20% viewed from 50 metres with naked eyes.
e) All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and droplets.
f) A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x 100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.
g) The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16 hours.

– Manual technical monitoring is shipped with the hardware with all explanations of failures and resolutions
Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day

Burning temperature – over 12000C

Two chambers – minimum

Emissions – dioxin and heavy metaly – better then Kyoto protocol

Emission – monitoring system

Waste unloiding – directly from waste track to incinerator

Waste Incineration HICLOVER Model TS75


Waste Incineration HICLOVER Model TS75 

Items/Model

TS75( PLC)

Photo

Concept

Waste Incineration

Burn Rate

Average 75 kg/hour

Feed Capability

Common 150kg

Control Establishing

PLC( Programmable Thinking Controller Burner)

Burning Chamber

770L

Inner Measurements

100x81x95cm

Second Chamber

385L

Smoke Filter Chamber

Yes

Feed Setting

Manual

Voltage

220V

Power

0.7 Kw

Oil Consumption (kg/hour)

Common 16.9

Gas Intake (m3/hour)

***

Temperature Level Display

Digital Show

Temperature Level Safety

Yes

Oil Storage Tank

100L

Feed Door

99x91cm

Smokeshaft

3Meter

Smokeshaft Type

Stainless-steel

1st.

Gross Weight

4500kg

External Measurements

2.30 mx1.30 mx2.55 m

2.0 Sec.

Gross Weight

4500kg

External Measurements

2.30 mx1.30 mx2.55 m

15kg-20kg LPG driven Clinical waste incinerator to burn highly infectious materials
100kg per hour *medical incinerator* is needed in the size of a *20ft container.* 
100Kg/Hour Burning rate with
       with Secondary burning Capacity
Je suis intéressé par votre produit Longue durée de vie Pet Crematory (YD-15), je veux savoir plus de détails sur:
Veuillez me proposer une liste de prix précis.
Ce serait formidable si vous pouvez me faire parvenir plus de détails sur ce produit.
Human Cremator For Crematorium Cremation Machine 
Automatic Medical Waste Incinerator with Auto Loading Systems.
The working capacity 150 KGs EACH BATCH
incinerator to be used for medical/clinical wastes incineration 


Medical Waste Burner HICLOVER TS10 PLC 10kgs per human resources


medical waste incinerator iraq price HICLOVER TS10 PLC 10kgs per hour

Items/Model

TS10( PLC)

Image

Melt Price

Regular 10 kg/hour

Feed Capability

Requirement 20kg/feeding

Control Mode

Programmable Reasoning Controller( PLC) Panel

Combustion Chamber

100L

Indoor Dimensions

50x50x40cm

2nd Chamber

50L

Smoke Filter Chamber

Yes

Feed Setting

Handbook

Voltage

220V

Power

0.5 Kw

Oil Usage (kg/hour)

standard 8.4 kg/hour

Gas Usage (m3/hour)

criterion 10.1 m3/hour

Temperature degree Display

Yes

Temperature Defense

Yes

Oil Storage Container

100L

Feed Door

30x30cm

Smokeshaft

5 Meter

Smokeshaft Kind

Stainless Steel

1st.

Gross Weight

1500kg

Outside Measurements

140x90x120cm

2020-06-30

Exterior Measurements

140x90x120cm


























hazardous waste disposal companies
HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-30


Automatic PLC controller heater plant with Double heat heaters and also twin chamber HICLOVER YD-30C with Damp Scrubber


Item

Needs

Layout

YD-30C

Key Product Listing

Key Burning Chamber( Main body stainless-steel)

Additional Burning Chamber( Key body stainless steel)

Mix-Combustion Chamber

Wet Scrubber( Laundering Tower)( Text stainless-steel)

Heater Control Circumstance

Smokeshaft:5.0 Meters

*( upgrade to Stainless-steel, complimentary expense)

Italy burner: 02 collections

Oil Storage Container (if oil gas): 100Liters

Automatic PLC controller incinerator plant with Twin cozy burners as well as twin chamber. Appropriate for waste of health and wellness centers Variety of burner 2 Nos Voltage 380V 50Hz Functional enjoinment 5 C 60 C Wetness 10 C 90%

Gas kind Natural gas Selection of chamber 02 Nos


HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-28


Large Capacity Animal Dog Cremation HICLOVER Version A1500 with E-Power Automobile. Door


Large Capacity Animal Pet Cremation HICLOVER Model A1500 with E-Power Auto. Door

Variation

A1500

Inner Dimensions

150 x 100 x 96cm

Match for Animal

Pet dog pet cat – – – – yes

– Dog – yes

Pig – – small

Cow – – tiny

Main Product Listing

Main Burning Chamber

Added Burning Chamber

Mix-Combustion Chamber

Smoke Filter Chamber

Burner Control Situation

Smokeshaft:10.0 Meters

*( upgrade to Stainless-steel, cost-free cost)

Italy oil/gas heater: 03 sets

Oil Tank (if oil fuel): 500Liters

Style for Pet Dog Dogs Cremation Organization

Movable system & & & & Vehicle. Door & Fire/Flame Surveillance Opening

Independent Placement for Tiny Family Pet





















HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-28


HICLOVER Heater mobile little With Wheel along with Brake


Version

YD-30 Mobile Kind

Picture

Burning Price

Ordinary 30 kgs/hour

Feed Capacity

Common 60 kgs/feeding

Chamber Text

Stainless-steel

Mobile Attribute

With Wheel and likewise Brake

Main Burning Chamber

280 Liters

Second Combustion Chamber

150 Litres

Mix Burning Chamber

Yes

Feed Setting

Handbook

Voltage

220V

Power

1.5 Kw

Gas Kind

Diesel Oil

Burner

Italy Original

Oil Consumption (Diesel Oil)

Criterion 13.3 kg/hour

Internal Measurements

80 x 60 x 60cm (major chamber)

Outside Capacities

125 x 90 x 260cm (without smokeshaft)

Temperature Level Degree Present

Yes

Oil Container Capacity( if oil fuel)

100 Litres

Door Opening

50 x 50cm

Smokeshaft Size

2.0 Meters

Chimney Type

Stainless-steel

Equipment Gross Weight

1600 kgs

Operation Technical Specifications

Key Chamber Temperature

800 ℃–– – – -1000 ℃

Additional Chamber Temperature

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Burning Effectiveness

> 98%

Waste Lower Calorific Power

3000Kcal


HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-28


medical incinerator manufacturer

1.The double chamber incinerator shall preferably be designed. Air supply in the primary and secondary chamber shall be regulated between 30%-80% and 170%-120% of stoichiometric amount respectively. Flow meter/suitable flow measurement device shall be provided on the primary and secondary air ducting. The combustion air shall be supplied through a separate forced draft fan accounting for the air supplied through burners. Provision shall be made in the primary chamber to measure the water column pressure.
2. Capacity : up to 4000kg      burn not less than 500 kg /hr
3. medical incinerator manufacturer The refractory lining of the chamber shall be strong enough to sustain minimum temperature of 1000dc in the primary chamber and 1200 dc in the secondary chamber. The refractory& insulation bricks shall have minimum 115mm thickness each & conform to IS:8-1983 & IS:2042-1972 respectively.
4. The incinerator shell shall be made of SS/MS plate of adequate thickness (minimum 5mm) and painted externally with heat resistant aluminium paint suitable to withstand temp.of 250 dc with proper surface preparation. Refractory lining of the hot duct shall be done with refractory castable (minimum 45mm thick)& insulation castable(minimum 80mm thick). Ceramic wool shall be used at hot duct flanges & expansion joints.
5.There shall be a separate burner each for the primary & secondary chamber. The heat input capacity of each burner shall be sufficient to raise the temp.in the primary & secondary chambers as 800+/- 50dc and 1050+/-50dc respectively within maximum of 60 minutes prior to waste charging. The burners shall have automatic switching off/on control to avoid the fluctuations of temperatures beyond the required temp.range.
6.Incinerator shall have graphic or computer recording device which shall automatically and continuously monitor and record dates, time of day, batch sequential number,Co,Co2,O2 in gaseous emission shall also be  measured daily.
7. Structural design of the chimney/stack shall be as per IS:6533-1989.The chimney/stack shall be lined from inside with minimum of 3mm thick natural hard rubber suitable for the duty conditions and shall also conform to IS:4682 part I-1968 to avoid corrosion to oxygen and acids in the flue gas.

8.The incinerator must have an emergency vent. The emergency vent shall remain closed ie. it shall not emit flue gaseous during normal operation of the incinerator.

9.Metal fuel tank from black steel (capacity not less than 2500 litres) and shall be installed at the incinerator Room. The tank shall be provided with all necessary fittings including fill, vent, drain and overflow line, level indication and access for inspection and maintenance. Level switches shall be provided for the following services.

(a) Low level alarm
(b) High level alarm
(c) Low level start of transfer pump
(d) High level stop of transfer pump

10.A ready built fabricated room shall be supplied for housing the incinerator. The room will be designed in such a way that free space is  available  on all sides and heat radiation  kept at minimum and giving the operators an easy workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion
– effectiveness for the treatment of placenta? and expired or spoiled drugs, cytotoxic and cytostatic drugs prescribed: narcotics eg
– Does it allow to treat drug or waste containing glass (whatever color: transparent or colored white) without causing explosions?
– The ability of the liquid waste treatment (blood, urine stained, other body fluids contaminated, regardless what volume packaging?
– The efficiency of process chemicals (after neutralization and detoxification: solids and liquids)
– Is there  microbiological testing especially: the processing efficiency bascillus

Waste Incineration Treatment BURNING COST: 100-150kgs per human resources HICLOVER TS150


BURNING RATE: -100 -150 kgs per hr

MINIMUM OPERATING TEMPERATURE: 800-1000 oC (PRIMARY BURNING)

MAX OPERATING TEMPERATURE LEVEL LEVEL: 1000-1200 oC (AFTER HEATING UNIT BURNING)

SECONDARY MELTING ABILITY: COMPULSORY

THICKNESS INSULATION: 50 mm high

Refractory ability: mins 114mm

STURDY REFRACTING LINING TO WITHSATND 17500C

AVEARGE WEAR OUT TIME: MAXIMUM 3HRS

GAS KIND: GAS OIL (DIESEL)

GAS CONSUMPTION IN LTRS/HR: average 14

RESIDNECY TIME IN SECONDARY CHAMBER: 2 PHASES

Items/Model

TS150( PLC)

Image

Idea

Waste Incineration Therapy

Melt Cost

Criterion 100-150 kg/hour

Feed Capability

Standard 750kg/feeding

Control Setting

PLC( Programmable Reasoning Controller Burner)

Chamber Product

High Alumina Fire Block Wall Surface, 1750 ℃ Rate

Paint for outdoors deal with

800 ° C Cost

Burning Chamber

1570L

Inner Measurements

150x100x105cm

Additional Chamber

750L

Smoke Filter Chamber

Yes

Feed Setting

Guidebook

Voltage

210/230V 50/60Hz

Power

0.9 Kw

Oil Consumption (Liter/hour)

Common 14( D.O)

Gas Consumption (m3/hour)

***

Temperature Screen

Digital Show

Temperature Level Protection

Yes

Oil Storage Tank

2000L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless Steel

1st. Chamber Temperature

800 ℃–– – – -1000 ℃

secondly. Chamber Temperature Level Degree

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

8500kg

Exterior Dimensions

300x160x280cm( without chimney)



HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-28