Numerous Sorts Of Burners


contaminated materials high temperature burners for the treatment of contaminateds materials. The waste will definitely be blended, including medical, oily wastes, woods as well as lab wastes. Key burning
Diesel/LPG/LNG burning primary burning chamber/primary burning location
Extra burning
House time in the second chamber very little less than 2 secs
Both primary and also the second temperature level degrees protected till all the waste has actually been entirely combusted
Chimney
Smokeshaft with a minimal altitude of 4 meters above ground level
Minimum leave rate of the discharges not less than 10 metres/second
Temperature level Cautions
Unique and/or obvious alarm to caution the vehicle driver when the additional temperature degree drops to below the called for temperature level
General
Control box that can be separated and positioned on separate stand at the very least 1.5 meters from incinerator at around 1.6 meter height

Burner variation A.
Burn Price 65kg/h minimum.
Weight (kg), please suggest:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Power Supply – for – Control Box – 220V-240V 50Hz solitary phase.
10m Tube Pipeline, suggest size. I000 Litre Gas Container+ Pipeline System, show volume. Included smokeshaft expansion
, indicate elevation. Service warranty, recommend no of years

Heater style B. Burn Price 150kg/h minimum.
Gas Retention Time – – 2 Secs. Diesel/LPG/LNG, please indicate. Minimum operating temperature level 920 ° C, please suggest.
10m Pipeline Pipeline, show dimension. I000 Litre Gas Container+ Pipe System, reveal quantity. Extra smokeshaft growth, show elevation.
Guarantee, reveal no of years

Heater variation C.
Burn Rate 250kg/h minimum.
Weight (kg) please indicate:.
2nd Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please program.
Power Supply for Control Box 220V-240V 50Hz solitary phase.
Minimum running temperature 920 ° C, please show.
One year Spare Parts Package for total maintainability.
10m Tube Pipe, recommend length.
I000 Litre Gas Container + Pipe System, reveal amount.
Added smokeshaft growth, reveal elevation.
Service guarantee, suggest no of years

Whole lot 4– – High Temperature Waste Incinerator.
HTW Incinerator layout D. Burn Cost – – 150kg/hour minimum.
Weight (kg), please show:.
Additional Chamber.
Gas Retention Time 2 Seconds.
Gas Diesel/LPG/LNG, please indicate.
Power Supply for Control Box 220V-240V, single stage 50-60Hz.
Minimum operating temperature level 1200 ° C, please show.
One year Spare Elements Plan for overall maintainability.
10m Hose pipe Pipeline, show length.
1000 Litre Gas Storage Tank + Pipe System, suggest volume.
Additional smokeshaft development, suggest elevation.
Service warranty, reveal no of years

Great deal 5– – Mobile Burner.
Mobile Incinerator version E. Burn Price 50kg/h minimum. Weight (kg), please show:.
Gas – Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please show. Minimum running temperature level 850 ° C, please suggest.
Assurance, suggest no of years

Lot 6– – Mobile Incinerator.
Mobile Heater design F. Burn Price 100kg/h minimum. Weight( kg), please recommend:.
Extra Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please suggest –. Power Supply – for – Control Box – 220V-240V 50Hz single stage. Minimum running temperature 850 ° C, please suggest. One year Spare Elements Package for full maintainability.
10m Tube Pipe, suggest length.
1000 Litre Fuel Storage Tank + Pipeline System, suggest quantity.
Additional smokeshaft growth, suggest altitude.
Assurance, show no of years

Good deal 7– – Heat Waste Mobile Burner.
HTW Mobile Incinerator style G.
Burn Rate 100kg/h minimum.
Weight (kg), please indicate:.
2nd Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please indicate. Power Supply for Control Box – – – – 220V-240V 50Hz solitary stage.
Minimum operating temperature 1200 ° C, please show.
One year Spare Parts Prepare for total maintainability.
10m Tube Pipeline, suggest size.
1000 Litre Gas Tank + Pipe System, show amount.
Additional chimney extension, recommend altitude


resilient and extremely efficient heaters with different capacities for hospital/medical waste, cremation as well as additionally various other solid waste therapies


Single and also Double Chamber Medical Incinerator.durable and incredibly dependable burners with numerous capacities for hospital/medical waste, cremation in addition to numerous other solid waste therapies.

Chamber Dual

Burning Rate 10 kg per hour (for 2 incinerators)

Burning Price 20 kg per hr (for three heaters)

Packing Method Manual

No of Burners Solitary for 10 kg/hour and Double for 20 kg per human resources

Gas Diesel and likewise Natural Gas

Heat Up Time Not above 20 mins

Temperature controller Digital

Power Supply Single Phase 220V

Smokeshaft Altitude 20 feet from ground degree

· 50kg per hr

· Option for medical waste.

Kind
Singular Chambered Round

Feed Product
Files, Containers wastes

Capability
1000 Kg/Day

Burning Capacity
125 Kg/hr

Format Standards
Normally validating to IS Standards

Sort of melting procedure
Absolutely No Gas System

Burning Chamber

Kind
Cylindrical

Measurement
1.25 m Dia (Approximate) x 1.2 m Elevation (Approx)

Temperature Degree
400– – 600 ° C

MOC
Chrome Alloy Steel, inside lining with fire bricks/Ceramic Clay

Outer Lining
Thermal Proof Cellular Lining

HEAP

Type
Self Sustained

MOC
MS

Devices
Port Opening as well as Ladder for exhaust screening with complete online massaging system, thermostat

The systems will be made use of for our consumer camps in the field.


Medical Waste Heater of 20 kg/hr capacity with dual burner


3 Medical Waste Incinerator of 20 kg/hr capacity with twin burner.Medical Waste Incineration Equipments. Our purpose for this task is to establish a plant in order to blaze Medical waste with 50 ton/day capability. Waste monitoring
Heater
* Outside dimension at base 6ft 1.8 m.
* Outside size at leading 4 1/2 feet 1.35 m.
* Internal size at base 3ft 0.9 m.
* Interior size at leading 3ft 0.9 m.
* Density of wall surface at base 18cm.
* Thickness of wall surface at leading 9cm.
* Perpendicular height of wall 4ft.
* Height of Iron bars from grate over ground 1ft

Material Required.
* Pool swish.
* 5 or 6 Iron bars regarding 4 1/2 feet 1.35 m long each.
* Amount of massive rocks for structure.
* 2 vacant kerosene tins for making air vent openings.
* 2ltrs of coal tar.
* 2 brushes.
* Framework 1ft-1 1/2ft deep is dug.
* Full of big stones as well as likewise puddle swish to ground degree.
* Uninhabited kero tins are following put right into position where the vent openings are to show up.
* Wall surface 1ft high is developed with pool swish.
* Iron bars are put in placement leaving a location of concerning 2cm-3cm in between the bars 4ft 1.2 m to be gotten to.
* Wall surface plastered smooth.Incinération à haute température pour la damage complète des déchets contaminés ou dangereux.
Principe de burning pyrolytique avec brûlage des fumées dans une chambre de post-combustion.
Incinérateur double chambre 900 ° C/1200 ° C de capacité 30 kg.
Equipé de: 1 brûleur de combustion + 1 brûleur de re-combustion + 1 laveur de fumées. Capacité de devastation horaire.
En poids: au moins 30 kg.
En quantity: au moins 200 litres.
Température:.
Burning: 900 ° C. Write-up combustion: 1200 ° C.
Puissance des brûleurs.
Burning: au moins 80 KW.
Article burning: 80 KW.
Puissance électrique: environ 2 KW.
Cheminée:.
Area: environ 30×× × × 30 centimeters.
Hauteur (minimum): au moins 8 m.
Dimension de la porte de chargement: environ 50X50 cm


heater tiny to tool waste dispossal


Carburant Diesel
Capacité (M3) 1.92
Ave Capability 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×× × × 2000.
Dimension internes
. Longueur( mm )2200.
Largeur( mm) 1050. Hauteur( mm) 800.
Optimum température d’opération 1320.
Température de suivi oui.
Thermostat oui.
Ventilateur oui.
Chambre de burning secondaire 2 secs.
garantie minimum 12 mois.
Carburant Diesel.
Capacité (M3) 1.18.
Ave Capability 750 kg.
Consommation (l/h) 6.
Dimension externes.
Longueur (mm) 3110.
Largeur (mm) 1800.
Hauteur (mm) 3300.
Ouverture Porte 770×× × × 2000.
Dimension internes.
Longueur (mm) 2100.
Largeur (mm) 700.
Hauteur (mm) 800.
Opération. burner tiny to tool waste dispossal for concerning 150-200 cosmopolitan waste from shopping mall, work environment as well as additionally residential.

The waste most include vary products plastics, rubber, paper, grass, leaves, timbers, fruits, item packaging container, as well as additionally a number of others

Minimum température d’opération 950.
Optimal température d’opération 1320.
Température de suivi oui.
Thermostat oui.
Ventilateur oui.
Chambre de combustion secondaire secs.
garantie minimum 12 mois.a little animal crematorium, creates along with rates

The waste most contain differ materials plastics, rubber, paper, turf, leaves, woods, fruits, packaging carton, as well as likewise whole lots of others

Minimum température d’opération 950.


Sudan Medical waste Therapy Strategy


•    A burn rate of 25 – 30kg/hr.
•    Consists of two chambers to ensure significant reduction of emissions and be capable of temperatures in the range of 800-1000˚c.
•    Incinerator must be of a low maintenance design, be diesel fuelled and need no more than 15 amp 220-250 V power. KW consumption per hour should be stated.
(1)  What  are  main  differences  between  medical  incinerators:    YD-10C  and  TS10(PLC)?
(2)  After  combustion,  the  medical  waste  becomes  smoke?  Without  smell?  No  pollution?
(3)  What  should  we  do  to  release  the  smoke?    Prepare  a  pipe  to  direct  the  smoke  to  factory  outside?
(4)  Any  operation  guide  for  reference,  we  worry  that  it’s  difficult  to  operate?
•    The incinerator should also be able to run off a generator.
•    The incinerator should have option of tank and should use no more than 12L of diesel fuel per hour to burn 25- 30kg of waste.options for medical waste incineration for Kabul, Afghanistan
•    Design must be such to minimize risk to operators and have a simple start sequence to minimize operator training and skills
•    Solid waste reductions in the range of 90 – 97% should be routinely achieved.a central thermal treatment station in the city of Khartoum (9 million inhabitants) we started with two units of autoclave that treat up to 18 tons a day so far, and looking forward to add an incineration plant/s to serve for medical, pharmaceutical, and hazardous waste.


Afterburner Preheat Heater


PRIMARY CHAMBER

Durable steel casing

Top-notch refractory cellular lining and also insulation Large complete measurement leading loads counteracted door
1 x oil/gas terminated ignition burners ran on/off

SECONDARY CHAMBER

Tough steel casing

Premium refractory lining as well as also insulation 2 second gas residence time
1 x oil/gas discharged ignition burners ran on/off

SMOKESHAFT

Heavy-duty stainless steel casing

CONTROL BOARD

Control of primary along with 2nd burners Temperature degree Talking to 4 figure display screen Thermostat control tool for heating system (gas saver) Timer control 0- 12 hrs

Important follower timer control

Technical Specs

Gas
Diesel

Ability
900kg (1.35 m ³)

Burn Rate
150kg/h

Avg Ash Residue
3%

Avg Fuel Consumption p/hr
20ltr

Operation
Minutes. Operating Temperature 950 ° C. Max. Running Temperature Level 1320 ° C. Residency Time in Second Chamber 2 Secs.
Temperature level Tracking YES

ANCILLARIES

Operating and maintenance guidebooks Conserves list

TRICK FEATURES

– – Afterburner Preheat

– – Incineration temperature degrees over of 1300 ° C

– – 5mm steel covering as well as totally shield

– – Dense refractory concrete lining rated to 1600 ° C


GENERAL SPECS FOR HEATERS


Main as well as extra burners: Different electrically spark-ignited major heating units along with second heating systems with automatic control will certainly be used to accomplish the specified temperature level needs in the additionally added as well as major chambers. The fires of the main and also additional heating units will not strike the burner wall surface surfaces or floor.
The main burning chamber need to:

1. Be accepted as the primary burning zone.
2. Be geared up with a burner/s melting gas/fuel or reduced sulphur fluid gas.

3. Make certain key air supply is controlled efficiently

Make sure minimal leave temperature degree is not a lot less than 850oC

Air supply: Air supply in the secret and likewise 2nd chamber requirement to be managed in between 30% -80% as well as 170%- 120% of stoichiometric quantity specifically. The combustion air will certainly be offered by means of a various forced draft fan after accounting for the air provided via burners.The second combustion chamber have to:

1.

3.

4.

5.
6. Ensure the gas temperature level as assessed against the inside wall surface in the secondary chamber & & & & not in the fire area, is very little less than 1100oC.

7. Make sure the oxygen web content of the released gases is not much less than 11%.
Make specific both main along with the burning temperature levels are maintained till all waste has actually been completely combusted

lnsulation: lnsulation to be utilized for stonework, boosted concrete, or non-combustible item will secure versus damages to the framework from extreme cozy as well as shall be of a density to limit the outside covering to an optimum temperature level of 66 ° C in an ambient temperature of 21 ° C when the heater is running at complete capacity.

Refractory: Refractory shall be #super responsibility # along with heat-resistant to a minimum of 1100 ° C in the vital chamber in addition to 1250 ° C in the secondary chamber. Refractory will also be abrasion immune in the prlmary chamber, built of plastic or castable kind refractory, developed to prevent protruding and additionally damage as a result of warmth tension, efficient in maintaining greater than twice the per hour burning price along with securing against leakage of fluids, as well as likewise with a minimal thickness of 11O mm for wall surfaces and also fire places


Dual-chamber controlled air heater or dual- chamber pyrolytic heater


Types of burner style appropriate: Dual-chamber regulated air heater or double- chamber pyrolytic incinerator

Products of building: The incinerator shall not have any type of type of asbestos, asbestos-containing compounds, mercury thermostats, as well as additionally mercury switches. Refractory products shall have the capability to satisfy pertinent standards under ISO TC33 along with CEN/TC 187. Waste feed system right into the combustion chamber batch or consistent loading: For constant loading, the automatic payment ram or auger feed system shall be capable of instilling percentages of waste at normal periods in addition to should certainly have the capacity to prevent waste from being fed when the burning chamber temperature is much less than 850 ° C. In addition, the waste feed need to just be able opened up at or listed below 50 ° C in an ambient temperature level of 21 ° C.Primary burning chamber: Shall be built with a housing (reinforced to hold up against interior stress without deflection or damage to the various other or refractory aspects) supported by an architectural framework and provided with refractory cellular lining and also insulation
Ease of access doors, openings, and additionally spaces: All access doors, openings, and likewise spaces shall be sealed to stop discharge of smoke as well as exhaust gas and likewise to obstruct admission of air throughout burner procedures. Doors subjected to flame or direct warm of burning gases shall be lined with the specific same kind as well as likewise density of refractory mobile lining and insulation as that utilized in the burning chamber

Grate system for the primary chamber Transferring grate, taking a trip grate, reciprocating grate, or turning drum grate

Main combustion chamber temperature degree # 850 ° C without cool locations

Additional combustion chamber: Shall be created with an exterior case (reinforced to sustain internal stress and anxiety without deflection or damages to the refractory or different other components) along with used with refractory cellular lining as well as insulation

Secondary burning chamber temperature level 1100 ° C or higher

Second burning chamber house time # 2 seconds after the swan song of air in the second chamber


a DUCK ranch heater


a DUCK farm burner, we require to acquire a tool size incinerator for organic waste, a lot more specific DUCKS.an animal dog crematorium in ireland.Equipment Double chamber medical infectious waste burner Capacity 10-30 kg per hr Features of waste
The list listed below average features are thought about *:

residence heating well worth above 2000 kcal/kg (8370 kJ/kg); material of combustible matter over 60%; internet material of non flammable solids listed below 5%; product of non-combustible fines detailed below 20%; moisture material listed below 30% by weight

Burning efficiency: The medica waste burner will certainly be capable of minimizing waste to ash not exceeding 10% of the total flammable prices. The scientific waste burner will be installed outdoors. All burner parts will certainly be appropriate for however not restricted to outside shaded arrangement, consisting of electrical electric motors, be resistent to rust, dampness and also relevant climate aspects.

Outside installment. The clinical waste incinerator will be mounted outdoors. All incinerator components will be suitable for however not restricted to outdoor shaded setup, including electrical motors, be resistent to corrosion, wetness and also related climate aspects.

can you please onward me some info. an ideal Burner for Incineration of oil, plastic hazardous waste, sludge waste, harmful filters etc.


arrangement of waste non multiple-use burner system


installment of waste non reusable system in airport.Incinerator with oil heater
Capability 2 ton/day, Oil storage tank 300 l Oil pump 0.4 Kw, Heating unit 0.2 Kw.
Variation: YD Collection.
– Diesel heater. It will definitely have usually paper, cardboard and likewise food, though also it will absolutely blaze medical waste. The heater will have the ability to deal with natural and also polluted products.
Smokeshaft External Size: not above 400mm.
Fan Power: require to not go beyond 1.1 kw.
Voltage: 220V.
Oil Consumption: Required to not surpass 14kg/hr.
Feeding Door Dimension: not less than 1000x1300mm.
Incineration Temparature: 800 Level or above.
Discharge:.
CO- Have to not exceed 100mg/m3.
SO2- Should not exceed 400mg/m3.
HF( Hydrogen Flouride)- Must not surpass 9mg/m3.
NO2- Must Not exceed 500mg/m3.
Given that it will certainly deal with organic and damaging waste, temperature level has to reach a minimum of 1100 degrees for a minimum of 2 Second. The flue gas cleansing equipment maust go to the very the very least two-field electrostatic precipitator/ESP, dust

– Diesel burner. It will absolutely have typically paper, cardboard and additionally food, though similarly it will definitely incinerate clinical waste. The heater will certainly have the capability to deal with natural and also polluted products. Since it will treat unsafe and natural waste, temperature level has to reach a minimum of 1100 levels for a minimum of 2 2nd.

–– 25Kg/h. It will certainly have generally paper, cardboard and also food, though likewise it will certainly incinerate medical waste. So the burner will have the ability to deal with organic and contaminated materials.

–– Spare components for one year.Burning Capacity: 400kg/ Human Resources (Optimum Combustion time is 6 times/ Day).
Smokeshaft External Size: not greater than 400mm.
Fan Power: need to not surpass 1.1 kw.
Voltage: 220V.
Oil Intake: Need to not surpass 14kg/hr.
Feeding Door Size: not less than 1000x1300mm.
Incineration Temparature: 800 Degree or above.
Emission:.
CO- Have to not surpass 100mg/m3.
SO2- Must not surpass 400mg/m3.
HF( Hydrogen Flouride)- Should not go beyond 9mg/m3.
NO2- Must Not exceed 500mg/m3.
Smoke Dirt: Have to Not surpass 100mg/m3

–– The design need to prevent any type of launch of contaminating substances right into dirt, surface area water and groundwater.

–– Burning area needs to get to a minimum of 860 degrees under the most damaging conditions with at least 6% oxygen. Since it will treat harmful and organic waste, temperature level has to reach a minimum of 1100 degrees for a minimum of 2 2nd.

–– Flue gases must be cooled down to 200 levels or reduced prior to flue gas therapy. The flue gas cleaning equipment maust go to the very least two-field electrostatic precipitator/ESP, dust << 30mgNm3.

–– Thermal efficiency not less than 85%.

–– It must be geared up with filter to minimize as well as include toxins from natural and clinical waste.

–– Easy to operate for virtually inexperienced employees.