Nanjing Clover Medical Technology Co.,Ltd. local in Nanjing city, China which is near to Shanghai port.

We are Waste Incinerator Manufacturer in China. We produce medical waste incinerators, pet animal cremation equipment and othe solid waste incinerators. The burning rate from 10kgs,20kgs,30kgs,50kgs,100kgs,150kgs,200kgs,300kgs,500kgs,600kgs per hour, the daily treatment capacity up to 6ton per day.

Clover Incinerators made all double combustion chamber, Italy original oil or gas burners. We use stainless steel chimney for our incinerator with long lifetime. For clean emission, we supply dry or wet scrubber with advantage technology.

Incinerator market and customers are all over the world and have local dealer supply direct service.

Nanjing Clover Medical Technology Co., Ltd.  is a leading waste incinerator manufacturer in China. All series included burning capacity 10kgs per hour, 30kgs per hour,50kgs per hour,100kgs per hour,150kgs per hour,300kgs per hour,500kgs per hour. Up to now, all models sale to all over the world and have good feedback from end-customer. The YD Model medical incinerator have multi-combustion chamber and basic dry scrubber (smoke filter chamber) with reasonable project budget. For the cleaner emission require, we accept custom made wet scrubber for incinerator and this will be also our next working by focusing on emission technical.

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.

Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

All our incinerator use stainless steel chimney, not steel.All our incinerator have two combustion chamber at least, not single chamber. All fuel burner from Italy made with famous brand, best quality.

300kgs per hour burning rate incinerator is well liked by market because this model can be medical waste incineration equipment for big hospital and also very good for other solid waste treatment with lowest cost, even if big size animals also can be feed into the combustion chamber. The primary combustion chamber volume is 2.4m3, big enough for common size animals. For shipping transport, YD-300 can be loaded into 40’feet full high container.

Big size combustion chamber up to 4.0m3 and Internal Dimensions is 257 x 147 x 108cm with feeding door opening 108 x 128cm. This model can be a small waste incineration factory with little amount of budget funds. If end customer use this for farm to burn animals like cow, horse or camel, contact with us now.

Contact with us by email or phone now!

Email: [email protected]
Phone: +86-25-84610201

 

 

 

 

 

 

 

 

 

 

Project Case

Iincinerator Map

Waste Incinerator International Market Analytics

Date. Jun. 10, 2012

 

Key Word:

small incinerators

medical waste incinerator

pet animal cremation incinerator

incinerator manufacturers

 

 

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below:

 

Treatment capacity: small scale incinerator, large scale incinerator and incineration pant.

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators

Incinerator fuel: gas incinerator, oil incinerator

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator

Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA) , Haat (India)

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour

 

Pyrolytic incineration technical is traditional waste treatment way for many years. All over the world, in many countries, people anti incinerator because the incinerator will produce a large Dioxin in the smoke. “Dioxins” refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics.  Dioxins can be released into the environment through forest fires, backyard burning of trash, certain industrial activities, and residue from past commercial burning of waste.  Dioxins break down very slowly and past releases of dioxins from both man-made and natural sources still exist in the environment. Anyhow, we have to remind that, this is large scale incineration pant, generally more than 30 ton per day. This is a social problem, to analyze and suggest ways in different angles from the public, government, economic development, environmental protection, technology development, etc.

 

So, why we still use incinerator?

First, for the medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution control.

Second, for human body, pet animal, in many countries and regions, we desire to cremation them. This is the ceremony in the process of society development, and ceremonies to commemorate the disappearance of life.

 

As above two reason but not only above, we still use incinerators.

 

How you can find reasonable incinerator for your local site?

Incinerator is not a cheap equipment, generally the small scale model’s price around $5,000usd per unit and large scale model’s price more than $50,000usd per unit. So, before purchase one unit incinerator, you have to make clear following items:

A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment?

B, small or large? This according to the waste output every day or the waste volume per feed time, like animal size.

C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don’t have gas supply system.

And other technology items, like power(220v, 380v), waste feed door type, incinerator structure, etc.

 

After you clarify these, you can go to find a local or international manufacturers, asking prices, technical specifications and ultimately purchasing the right products.

Wrote by Nicky

 

List of Incinerator Customers

 

Asia:

East Timor

Papua New Guinea

Indonesia

Kazakhstan

Viet Nam

Georgia

United Arab Emirates

Iraq

Africa:

Somalia

Mauritius

MoroccoI

Tanzania

Rwanda

Zambia

Oceania:

Australia

Europe:

Belgium

Moldova

North America:

United States

 

 

 

 

 

 

FAQs

Q: what is kind of waste can use in this equipment?

A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste.

 

Q: Incinerator Smoke Standard

A: China Government Standard: No.GB18484-2001.

 

Q: Treatment capacity

A: Average Capacity calculated by medical waste(lower calorific power (L.C.P): 3.0TH Kcal/Kg per hour), not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity.

 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use.

 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that’s mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator.

*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste.

 

Q: Assembly and Testing

A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order.

 

Q: Combustion Temperature

A: The first combustion chamber: 800-1000 centi degree.

The second combustion chamber: 1000-1200 centi degree.

 

Q: Incinerator Control Mode

A: Default Control mode is common control case. PLC mode according to model and order.

 

Q: Operation and maintenance costs

A: Operation cost according to fuel consumption rate and power/staff, etc.

 

Annual around $500-$1000usd per year maintenance according model, use situation.

 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element.

 

Q: The Residency time in secondary combustion chamber

A: 02 sec.

 

 

 

 

 

 

Contact Us

Nanjing Clover Medical Technology Co., Ltd.

Tel: +86-25-8461 0201

Fax: +86-25-8461 0406

Website: www.inciner8.cn

Email:  [email protected]

contact hiclover

Service Skype: clover-incinerator

Pусский: www.hiclover.ru

中文: www.haiwo.net 

Photo Gallery: www.eclover.net 

Clover News: www.incinerator.info

Facebook: www.facebook.com/hiclover 

Twitter: twitter.com/hiclovercom  

YouTube: youtube.com/c/IncineratorClover


Send Message by below contact form:

Contact Form

 

china lab waste incinerators

.Necessary tooling and gauges shall have also to be supplied.

 

14.Supplier shall have to arrange free training for user staff in operation and maintenance

 

15.Supplier shall have to provide related drawings/diagrams (civil, mechanical and electrical etc.)electrical load and

electrical circuitry

 

16.Warranty period shall be 24 months from date of proving test.

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies

from around the world.  We are looking to incinerate approx. 1 to 2 tons of bio-medical waste per day using LPG for

heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.

Also, please include emissions reports of all of the various machines that could be of interest to us especially with

regards to  dioxins and furals as well as lists of recommendations from past clients.

medical hospital incinerator

Capacity: 30 Kg.

destruction capacity: 3.000 kcal/kg diesel.

max consume: 2.5 gal per hour.

1 camera:

1 burner capacity: 80.00 kcal

Type: K (Ni-CrNi)

enter size: 500x500mm

ash door: 190 x 250mm

all kind of medical, hospital, veterinary and industrial wastes by Incineration Process.

So, we’re interested with your Incinerator plants, and we’d like to get quotation and key features description of

different capacities of your Incinerator plants, concerning: small models (5 – 25 kg/hr); medium models (25-50 kg/hr)

and big models (50-100 kg/hr) and plus.

 

2 camera:

1 burner capacity: 80.000 kcal.

Air conbustion: 0.5 HP

Type: K (Ni-CrNi)

 

  • Total waste produced per day: 10-12 tonnes;

 

  • Hours of Operation: 10 hours a day;

 

  • Fuel requirement: Diesel or waste oil preferred but LP gas will be considered;

pet cremation incinerator cost

Intermittent Feed (w/optional loader): .9 yd3/hr (.7 m3/hr) up to 8 hrs/day

 

 

 

 

Specifications: Length overall -9′-6″ (2896 mm) batch system w/o loader

 

 

 

 

18′-6″ (5639mm) w/optional loader system Width overall -7′-6″ (2820mm)

 

 

 

 

Height (w/o stack) -10′-0″ (3048mm) Approx. Weight – 14,000 lbs. (6364 kg) w/o

 

 

 

 

Loader

 

 

  1. The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans

if measured for a period of 6 to 16 hours.

 

Note:

All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.

 

Oxygen correction is computed as:

 

Es =      21 – Os    x EM

21 – OM

 

Where:   Es   = Calculated emission concentration at the standard percentage oxygen concentration

EM = Measured emission concentration

Os   = Standard oxygen concentration

OM = measured oxygen concentration

 

10   Operation     1.    Materials destined for incineration should be of known origin and composition and must

be only incinerated in a furnace that is registered for the particular type of waste.

 

  1. A record must be kept of the quantity, type and origin of the waste to be incinerated.
  2. The incinerator must be preheated to working temperature before charging any waste.
  3. The incinerator must not be overcharged.
  4. The incinerator must be in good working order at all times and must not be used if any component fails. Any

malfunction should be recorded in a log book and reported to the relevant authority.

 

  1. The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control

authority.

 

11   Housekeeping     The site where the incinerator is built must:

 

  1. Have running water.
  2. Have a solid floor.
  3. Have lighting if 24hrs operation
  4. Have fly ash containerization and storage before disposal.

 

 

12   Health & Safety (Protective Gear) 1.    Staff handling waste must be well trained on safe handling of

hazardous wastes

  1. Staff must be provided with appropriate protective gear such as, gas mask, aprons, gumboots, helmets, gloves,

goggles.

 

  1. Caution and Warning signs must be provided.
  2. Fire fighting equipment must be provided
  3. There should be no smoking or eating on the site.

 

BURNER DIESEL FIRED


Heater 20 Kg
Burner electrically ran
containing:
A cage for receipt of biomedical waste;
A burning chamber with fireplace with a filter to preserve ashes;
A cover;
An air supply;
A wind generator allowing supply air.
Burning temperature: 1800 ° C.
Consists of all gadgets. ▪ The burner ought to be a modern-day garbage disposal system, made
to bum medical waste in a neat in addition to eco effective
fashion. It needs to use a temperature based reasoning control system
To supply ideal control of the operating problems and
incorporate a high ability thermal oxidizing extra chamber.
It needs to be made to keep the exhaust gases, for a minimum of 2
secs to make sure the device’s dependable damage of the combustion
items.
▪ All the burners to be supplied as well as established fulfill the
Waste Keeping Track Of Standard 2006, authorized notice No. 121 of
29th September 2006 as well as specifically third schedule legislation
( 26, 47) connecting classification, standards, standards, in addition to
procedure for establishing as well as running incinerators.
▪ The capability of the burner called for must be to the
specifications with a capacity to thaw 100kgs/Hr.
▪ The burner will be operated a three-phase power supply
( keys).
▪ For the technological exam, not just the treatment plant
the whole system will certainly be taken into consideration. It will be the responsibility
of the Bidder to give a complete system, consisting of all eventually
moreover essential extra systems and also additional
devices.
▪ The system supplied will be established to run normally under
the conditions of the buyer’s nation. The conditions include
Power Supply, Environment, Temperature Degree, Wetness, and so on
▪ The Potential customer needs to supply a warranty for one year.
▪ All message, spec etc. on all control running user interfaces as
well as on info displays in addition to on print-outs will certainly remain in
English language.
▪ The Potential buyer supervises of all consents as well as also approvals for
importation. The Prospective purchaser will offer all the vital
paperwork in order to aid with the authorized demands for the
installation as well as likewise putting into usage the tools.

▪ Duration of Implementation is 90 days from agreement trademark for
delivery to website along with completion of all confirmation procedures
needed for the issuance of provisionary approval.
▪ Representatives of the Obtaining Authority and also the
Recipient, together with the Prospective customer’s representative, will
carry out the controls, testing and likewise initial authorization for provisional
as well as also last authorization. The provisionary and last approval shall
occur at the last location.
▪ Customer care: The Prospective buyer is called for to guarantee that a.
upkeep, solution and also dealing with centre, which is recognized by.
the Manufacturer, as well as which has the ability to swiftly offer genuine.
additional components and also consumables recommended by the Distributor.
is supplied throughout the one year solution warranty duration. In.
fulfillment of this demand with their offer, possible purchasers must.
send a declaration authorized by the producer or agent.
of the manufacturer:.
ͦ Providing the name along with address of its qualified.
upkeep, solution in addition to repair centre,.
ͦ Verifying that this recognized maintenance, service and additionally.
repair work centre has the ability to swiftly provide authentic extra components along with.
the consumables suggested by the Manufacturer; and.
▪ The Prospective buyer will be liable to offer as well as additionally install all.
devices supplied to the healthcare facilities in the.
Republic of Kenya. The Bidder will supply a time routine over.
the total structure as well as creating duration. The delivery.
and additionally setup time have to be agreed between prospective buyers, target.
Clinical center and additionally the Getting Authority. The treatment plant must.
show up pre-assembled. The Possible customer shall ensure that all parts of.
the plant moved by sea shall not be supplied as “deck.
cargo”.
▪ It is prepared for that the Potential purchaser cooperates really carefully with the.
service provider for the new waste managing framework/ property and also will.
make available all required technical information, attracting, and so forth to.
the professional.
▪ The Prospective buyer will provide as well as also mount the incinerator with the.
adhering to connected specifications

For the Supply, configuration & & & & appointing of a Professional Waste Burner as comprehensive listed here:.
i. Waste kind Healthcare waste.
ii. Waste thickness 125 to 350Kg/M3.
iii. Waste Calorific Value 4000 KCAL/Kg.
iv. Dampness internet material 10-25%.
v. Approximated ash residue 5-10%.
vi. Little capability 100Kg/hour established loads.
vii. 2nd chamber 2 seconds @ 1100 ° C. viii. Environmental Administration Coordination Act, 1999 and also specifically, Waste checking standards, 2006.
2 Devices.
2.1 Secret Combustion Chamber.
▪ The crucial combustion chamber is the significant framework of the.
heater, made from light steel plate and also tensed with.
rolled steel areas. It is brought from the flooring level on a.
considerable steel help framework. Internally the covering is lined with.
calcium silicate insulation and likewise a warm face combination of very.
obligation brickwork or high durability castable.
▪ The primary burning chamber require to guarantee minimum separation.
temperature degree is not less than 850 ° C
. One Guidebook Lots Burner making up:.
▪ Handbook Loading door (sturdy steel door with suitable.
refractory lining).
▪ Horizontal strong hearth, refractory lined vital burning.
chamber. Approximate dimensions 800 mm sizes x 2100mm.
long.
▪ Complete sized mass load/ash elimination door.
▪ 1 off diesel-fired ignition heater– – temperature managed.
▪ 1 off melting air supply follower and likewise blood circulation system, automated.
control.
▪ High capacity second combustion chamber with house time.
not much less than 2 secs @ >> 1100 ° C. ▪ 1 off diesel-fired afterburner– – temperature level managed.
▪ Control panel– – automated operation.
▪ Temperature level indication primary as well as additionally additional chambers 0-.
1200 ° C. Both chambers need to be shielded with refractory.
material (extremely commitment 100mm thick firebrick with 25mm thick.
calcium silicate insulation).
Remember: The second burning chamber have to make sure that the gas temperature as established versus the within wall surface in the second chamber & & & & not in the fire location, is not much less than 1100 ° C. 2.2 Throughput.
100kg/hour at a little calorific worth of 4,000 kcal/kg and also a common bulk density of I20kg/ M3 for fundamental waste along with l60kg/ M3 for healthcare waste.
2.3 Ash.
The waste will be reduced by 90 ~ 95% to leave 10 -5% ash.
2.4 Quality/Environmental Needs.
▪ Setup Monitoring and also Sychronisation Act, 1999.
▪ BS3316.
2.5 Running Duration.
▪ Anticipated day-to-day operating duration 8 hrs.
▪ Maximum running period 12 humans resources.
2.6 Chamber.
▪ Should be refractory lined to the adhering to requirement; Hearth in addition to.
reduced area of chamber walls.
2.7 Warm face product.
▪ Super responsibility firebrick.
▪ Limiting constant option constraint 1500 ° C. ▪ Thickness 100mm.
▪ Thermal conductivity 1.3 W/mk.
2.8 Insulation.
▪ Calcium silicate.
▪ Limiting constant service constraint 1000 ° C.
▪ Thickness 25mm.
▪ Thermal conductivity 0.095 W/mk.
2.9 Smokeshaft/ Lot.
▪ Need to be manufactured from refractory lined light steel or high.
top-notch air-cooled stainless steel. The chimney/stack needs to have a.
minimum elevation of 10 meters over ground degree.
▪ Refractory lined flanged smokeshaft should more than the elevation of.
any type of kind of existing roofing adjacent to the incinerator.
▪ Give training equipment to lift, put up as well as likewise position smokeshaft, along with.
offer sustains slings as essential. Enable cutting of tree.
branches to assist in the workout.
▪ The smokeshaft will be painted with accepted warmth immune.
paint after arrangement.
2.10 Ignition Burners.
Totally packaged oil kind, total amount with electric ignition as well as additionally flame failure controls, wired with continuous running fan as well as likewise complete with all shutoffs, fan as well as additionally electrical motor.
· Optimum rating: a minimum of 450kW/hour.
· Heater: set up on/off procedure.
· Optimum usage: a minimum of 6 litres/hour.
· Ordinary consumption: at least 3 litres/hour.
2.11 Afterburner.
Fully packaged oil kind, total with electrical ignition along with flame failure regulates wired with consistent running fan and also total with all shutoffs, fan as well as also electrical motor.
Maximum ranking: at the very least 450kW/hour.
Burner: set up on/off operation.
Maximum use: at the very least 9 litres/hour.
Average intake: at the minimum 4.5 litres/hour.
2.12 Flue gas therapy.
▪ Demands to have particulate cleanser (scrubbers). A mechanical.
fragment collection agency ought to be incorporated after 2nd.
shedding chamber for removal of bit pollutants.
entrained in the flue gas stream.
2.13 Diesel Storage tank.
▪ To supply diesel services storage tank (Capability 400 litres).
including degree indication.
▪ The container need to be connected to the burner at greater level.
to make it possible for free-flow of diesel from the tank to the incinerator.
The connecting pipe needs to be a black pipeline of approved scale.
as well as size. Consist of various other going along with gadgets and.
fittings.
▪ Attach heaters to fuel supply.
2.14 Electrical Supply.
▪ 3 stage 415 V a.c., 50/60 Hz.
3 Papers:.
Procedure handbook 2 collections.
Service/maintenance guidebook 2 collections.
4 Certification.
▪ National Atmosphere Keeping An Eye On Authority (NEMA).
certification.
5 Capability to service devices.
▪ The agent/supplier will have adequate facilities, spare elements,.
consumables and also certified as well as also experienced technical personnel.
Configuration jobs.
▪ Provide elevating gears as forklift, gantry, rollers, and also training.
jacks and additionally establishing heater.
6 Selecting along with Training.
▪ The Rep will examine prepared operating specifications

▪ The representative shall carry out a 2 days operation & & & & maintenance. training to the Biomedical engineering staff members along with heater.
operators after configuration & & & & appointing of the devices.
7 Commissioning Maintenance Agreement.
▪ Prior to the expiration of the service guarantee/ signing off, the distributor shall.
supply a 1 year alternative option parts (e.g. oil filters, air.
filters), the Quarterly normal upkeep price per quarter.
for 3 (3) quarters.

Maintenance control recommendation.
▪ The maintenance agreement cost consists of work, transport and also.
lodging for the participating in service technicians.


mobile incinerator design

The Authority may require that the certificate holder have tests carried out by an accredited institution to

determine stack and/or ground level concentrations of the following substances.

 

Cadmium and compounds as     Cd

Mercury                                      Hg

Thallium                                     Tl

 

Chromium                                  Cr

Beryllium                                    Be

Arsenic                                       As

Antimony                                    Sb

Barium                                        Ba

Lead                                            Pb

Silver                                          Ag

Cobalt                                         Co

Copper                                        Cu

Manganese                                  Mn

Tin                                               Sn

Vanadium                                     V

Nickel                                           Ni

Hydrochloric                                HCL

Hydrofluoric acid                         HF

Sulphur dioxide                           S02

 

  1. A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in

the waste feed where:

 

DRE = [(Win – Wout)/Win]*100

Where: Win = mass feed rate of the POHC in the waste stream fed to incinerator, and

Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.

SOLID WASTE INCINERATOR

1

ea

 

 

1.5 MMBtu / hr waste combustion, providing 200-250 lb/hr (90-114 kg/hr)

 

 

 

 

Processing capacity for mixed waste streams with an average gross

 

 

 

 

HHV of 5500-8500 Btu/lb

 

 

 

 

Batch Operation: Approx. 1.9 yb3 (1.45 m3) per 4-6 hour operation cycle

manufacturer of ha zardous waste incinerator in china

?Incinerate minimum 80kg/hr X 12 hrs per day

?Disposal of both non-hazardous and hazardous waste streams (per waste inventory)

?Mobile Unit (Skid mounted preference with lifting points)

Design/Specifications

?Incinerators must have a secondary combustion chamber with a minimum temperature range of 900c

?Liquid waste streams shall be incinerated by an appropriate liquid injection system

?The incinerators will be installed with visual alarms to alert operations of low temperature in the secondary chamber

Operating Environment and Ambient Conditions

 

The Incinerators package shall be designed to operate under the following conditions:

?Average Daily Max/Min June Temperature, 21-39°C

?Average Daily Max/Min January Temperature, 2-12°C

8.The incinerator must have an emergency vent. The emergency vent shall remain closed ie. it shall not emit flue

gaseous during normal operation of the incinerator.

 

9.Metal fuel tank from black steel (capacity not less than 2500 litres) and shall be installed at the incinerator Room.

The tank shall be provided with all necessary fittings including fill, vent, drain and overflow line, level indication

and access for inspection and maintenance. Level switches shall be provided for the following services.

 

(a) Low level alarm

(b) High level alarm

(c) Low level start of transfer pump

(d) High level stop of transfer pump

 

10.A ready built fabricated room shall be supplied for housing the incinerator. The room will be designed in such a way

that free space is  available  on all sides and heat radiation  kept at minimum and giving the operators an easy

workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly

coated with metal primer and epoxy paint to withstand sea corrosion

11.CE certificate and comply with EU regulations

 

12.Necessary Maintenance spares and concomitant accessories have to be supplied with  Incinerator System

Class 1:  Industrial Plants Burning Waste as an Additional/Alternative Fuel

Incinerators in which the waste serves as the fuel or supplementary fuel in an industrial process (e.g. the use of

cement kilns or any other industrial boilers or furnaces for the disposal of noxious or hazardous materials).

incinerators animal

Class 2          Industrial Incinerators

Class 2A:    Commercial

Incinerators for the disposal of waste that contains hazardous, potential hazardous and bio-medical waste where the

operator exceeds 100 Kg/day.

  1. Dimensions: 2.2m(l) x 1.5m(w) x 2.5m(h)
  2. Fully automatic computer multi control system.
  3. Fuel Options- Diesel and natural gas, electricity
  4. Wasted fuel- >12L/h
  5. The incinerator should burn up to 200kg < of waste per hour.
  6. Min.temperature-750癈<
  7. Max.temperature-1000癈<

 

Class 2B:      Small Scale Incinerators for Private Use

Incinerators for the disposal of hazardous, potential hazardous and bio-medical waste where the operator does not

exceed 100 kg/ day.

 

Class 3:  General waste Incinerators

Incinerators for general waste that is non toxic, non hazardous, non medical or does not  contain organic halogens,

i.e., selected customs, police, contraband goods, offices waste, commercial waste  and industrial wastes) where the

operator does not exceed 1 ton/ day.

 

 

STANDARDS, GUIDELINES, CRITERIA, PROCEDURE FOR INSTALLING/OPERATING INCINERATORS

 

No. Parameter     Standards, Guideline, Criteria and Procedure

 

1     Basic Plant Design     An approved plant must have four distinct sections that demonstrate three principles of

Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated sections may include but not

limited to:

 

Overall plant layout.

Feed chamber/ charging   —build by local customer

Primary Combustion Chamber. –yes

Secondary Combustion Chamber. –yes

Particulate Scrubbers—- filter brick chamber included

Acid Gas Scrubbers—none

The stack/ chimney. –yes

2     Feeding And Charging     Controlled hygienic, mechanical or automatic feeding methods have to be used which will

not influence the air temperature in the primary and secondary chambers of the incinerator negatively.

 

No waste is to be fed into the incinerator:

 

  1. Until the minimum temperatures have been reached.—manual feeding

Please  incorporate a mechanical feeder

  1. If the minimum combustion temperatures are not maintained. –yes
  2. Whenever the previous charge has not been completely combusted in the case of batch feeding. –yes

 

  1. Until such time as the addition of more waste will not cause the design parameters of the incinerator to be

exceeded. –yes

 

3     Primary Combustion Chamber The primary combustion chamber must:

 

  1. Be accepted as the primary combustion zone. –yes
  2. Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels. Other combustion methods will be

judged on merits.

 

  1. Ensure primary air supply is controlled efficiently–yes
  2. Ensure minimum exit temperature is not less than 850oC—800-1000 oC

 

4     Secondary Combustion Chamber (Afterburner). The secondary combustion chamber must:

 

  1. Be accepted as secondary combustion zone. –yes